Where Do You Want It? | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Sep 15, 2003

Where Do You Want It?

ISS Crew Offloading Three Tons Of Progress Supplies

The unloading of nearly three tons of new supplies from a Progress cargo vehicle began in earnest this week aboard the International Space Station. Commander Yuri Malenchenko and NASA ISS Science Officer Ed Lu spent time each day unpacking, cataloging and stowing the equipment.

The ISS Progress 12 (12P) vehicle brought food, fuel and equipment to the Station Aug. 30,US time. This week, the thrusters on 12P were successfully tested and can be used to increase the Station's altitude when necessary. Also, nitrogen from the cargo vehicle's gas tanks was used to add pressure to the atmosphere inside the Station, while oxygen repressurization from 12P will occur later.

Among the new supplies were two canisters for the Resistive Exercise Device weightlifting machine, which Lu installed Friday. Coincidentally, Lu had trouble adjusting the resistance on one of the previous canisters Wednesday. He removed that set and will work to repair the problematic canister next week so that the new ones that arrived on Progress can be reserved for the next crew to live aboard the Station.

Friday, flight controllers in Mission Control Houston worked on the communication link between the Space Station and control centers in Houston (TX), Moscow and Huntsville (AL). The crewmembers noticed they were barely able to hear voice calls from the capcoms, or spacecraft communicators, from each of the centers. The problem was narrowed down to equipment in Houston that relays the audio to the Station from all the control centers.  Engineers will continue to troubleshoot the issue with the hardware. In the meantime, the audio link to the Station has been restored to normal levels by temporarily bypassing that specific piece of hardware.

FMI: http://spaceflight.nasa.gov

Advertisement

More News

NTSB Final Report: Piper PA-44-180

While On The Base Leg Of The Airport Traffic Pattern The Right Main Landing Gear Did Not Fully Extend Analysis: Both pilots reported that after performing airwork they returned to >[...]

Classic Aero-TV: The Bizarre Universe of Klyde Morris Cartoons

From 2023 (YouTube Edition): Putting the ANT in Antihero A Beech Starship speeds along at altitude. “Deflectors on!” a voice from within the aircraft cries. “Look>[...]

ANN's Daily Aero-Term (11.09.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

Aero-News: Quote of the Day (11.09.25)

“Beginning this aircraft subsystem testing is the culmination of more than a decade of focused engineering and certification refinements. This is the moment where our intende>[...]

Classic Aero-TV: Falling for Para-Phernalia’s Softie Emergency Parachutes

From 2023 (YouTube Edition): The Best Option for A Pilots’ Worst Days Since its 1979 founding, Para-Phernalia, Inc. has designed and manufactured the Softie line of pilot eme>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC