GAO Report: FAA Needs IT Management, Oversight Improvement | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Sep 25, 2004

GAO Report: FAA Needs IT Management, Oversight Improvement

Agency performed well in planning, requirements management and technical analysis

The GAO has issued a pair of reports that point to problems with IT management and oversight at the Federal Aviation Administration. specifically, the report states that the FAA needs to improveme its software acquisition processes and work to eliminate a series of weak points that will lead to cost overruns, delays and other shortfalls.

The reports, according to Government Computer News, state that the FAA is doing well in the areas of project planning, requirements management and the identification of approaches to resolve technical issues related to the acquisition of IT technology.

However, it also found shortcomings in the agency's verification, QA and performance measurement, as well as in needs analysis. GAO also applauded the agency's adoption of the Integrated Capability Maturity Model to analyze software development skill maturity, but noted that project managers are being given the option to use or ignore the Model in their projects.

“The projects that have adopted the model have demonstrated growth in the maturity of their processes, and more and more projects have adopted the model,” GAO said.  “The recurring weaknesses we identified in our project-specific evaluations are due in part to the choices these projects were given in deciding whether and how to adopt this process improvement initiative."

The report recommends that the FAA implements the model, or an equivalent, in the entire Air Traffic Organization, and should standardize its measurement and oversight processes throughout the agency.

FAA officials expressed general agreement with the audit findings and have begin implementing the recommendations.

FMI: www.gao.gov/new.items/d04901.pdf, www.gao.gov/new.items/d04822.pdf

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC