AD: Rolls Royce | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Dec 19, 2003

AD: Rolls Royce

AD NUMBER: 2003-25-08
MANUFACTURER: Rolls Royce
SUBJECT: Airworthiness Directive 2003-25-08

SUMMARY: The FAA is adopting a new airworthiness directive (AD) for Rolls-Royce Corporation (formerly Allison Engine Company) AE 3007A1, AE 3007A1/1,  AE 3007A1/3, AE 3007A3, AE 3007A1E,and AE 3007A1P turbofan engines, with 1st to 2nd stage turbine spacers, part number (P/N) 23069627, 23070989, 23072849, or 23075364 installed. This AD reduces the life limit for 1st to 2nd stage turbine spacers, P/N 23072849, to a certain lower life limit, based on engine model.This AD also requires a one-time fluorescent penetrant inspection (FPI) of 1st to2nd stage turbine spacers P/Ns 23069627, 23070989, 23072849, and 23075364 before reaching the spacer life limit, within specified cycles-since-new (CSN), and requires replacement of the spacer if found cracked, or with bent or missing aft tangs. This AD is prompted by a report that during a scheduled inspection, aft pilot tangs on a 1st to 2nd stage turbine spacer were found bent and cracked. We are issuing this AD to prevent 1st to 2nd stage turbine spacer failure, leading to uncontained turbine failure, engine shutdown, and damage to the airplane.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20032508

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC