Navy Awards Contract For Operational Test CH-53K Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Sat, Jun 08, 2013

Navy Awards Contract For Operational Test CH-53K Aircraft

Operational Evaluation For The Helicopters To Be Conducted By The USMC

The Naval Air Systems Command (NAVAIR) has awarded a $435 million cost-plus-incentive contract to Sikorsky to build four production-representative CH-53K heavy lift helicopters for the U.S. Marine Corps on May 30. These four aircraft will be the System Demonstration Test Articles (SDTA) that the Marines will test during operational evaluation.

“The SDTA contract represents an exciting and significant milestone in our program,” said Col. Robert Pridgen, the Heavy Lift Helicopters program manager for NAVAIR. “We are well on our way to making the CH-53K a reality for our Marines and our naval fleet. The capability this aircraft brings, in every clime and place, is critical to sustaining the future missions of the Marine Air/Ground Task Force. The future of heavy lift is bright.”
 
“The four SDTA aircraft are based on the configuration of the fourth and final flight test aircraft currently being assembled on the prototype production line,” said Dr. Michael Torok, Sikorsky’s CH-53K Program Vice President. “We truly appreciate the high level of confidence the Navy and Marine Corps have shown to the CH-53K team as we move forward with this important next phase of the program.”
 
The Navy has included the SDTA helicopters as an additional contract line item under the existing $3.5 billion System Development and Demonstration (SDD) contract initially awarded to Sikorsky in April 2006. The contract schedule requires Sikorsky to deliver the first SDTA aircraft in 39 months, and the fourth by the end of March 2017, when the Marines will begin operational evaluation. The contract’s fee arrangement incentivizes Sikorsky to deliver early. Sikorsky will perform final assembly of the SDTA aircraft at the company’s Florida Assembly and Flight Operations facility in West Palm Beach.
 
To date, Sikorsky has delivered two of the seven SDD CH-53K aircraft – the Ground Test Vehicle and the Static Test Article – into the test program, and is finalizing assembly of the four flight test aircraft and the Fatigue Test Article. First flight of a CH-53K prototype aircraft is expected in late 2014.

(Images provided by NAVAIR)

FMI: www.navair.navy.mil


Advertisement

More News

ANNouncement: Now Accepting Applications For Oshkosh 2024 Stringers!!!

An Amazing Experience Awaits The Chosen Few... Oshkosh, to us, seems the perfect place to get started on watching aviation recover the past couple of years... and so ANN is putting>[...]

Aero-News: Quote of the Day (06.13.24)

“NBAA has a tremendous responsibility to the business aviation industry, and we are constantly collaborating with them. Our flight departments, professionals and aircraft own>[...]

ANN's Daily Aero-Term (06.13.24): Dead Reckoning

Dead Reckoning Dead reckoning, as applied to flying, is the navigation of an airplane solely by means of computations based on airspeed, course, heading, wind direction, and speed,>[...]

ANN's Daily Aero-Linx (06.13.24)

Aero Linx: Vertical Aviation Safety Team (VAST) We are a public–private initiative to enhance worldwide flight operations safety in all segments of the vertical flight indust>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC