Curiosity Out Of Safe Mode | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Thu, Nov 14, 2013

Curiosity Out Of Safe Mode

Rover Has Returned To Normal Operations

NASA's Mars Science Laboratory Project received confirmation from Mars Sunday that the Curiosity rover has successfully transitioned back into nominal surface operations mode. Curiosity had been in safe mode since Nov. 7, when an unexpected software reboot (also known as a warm reset) occurred during a communications pass with the Mars Reconnaissance Orbiter. Mission science planning will resume tomorrow, and Curiosity science operations will recommence on Thursday.

"We returned to normal engineering operations," said Rajeev Joshi, a software and systems engineer for the Curiosity mission at NASA's Jet Propulsion Laboratory in Pasadena, CA. "We are well into planning the next several days of surface operations and expect to resume our drive to Mount Sharp this week."

After analyzing the data returned by the spacecraft on Thursday evening, Nov. 7 (Pacific Time), the Curiosity operations team was able to determine the root cause. An error in existing onboard software resulted in an error in a catalog file.  This caused an unexpected reset when the catalog was processed by a new version of flight software which had been installed on Thursday. The team was able to replicate the problem on ground testbeds the following day. Commands recovering the spacecraft were uplinked to the spacecraft early Sunday morning.

NASA's Mars Science Laboratory Project is using Curiosity to assess whether areas inside Gale Crater ever offered a habitable environment for microbes. JPL, a division of the California Institute of Technology in Pasadena, manages the project for NASA's Science Mission Directorate in Washington.

(Image provided by NASA)

FMI: www.nasa.gov

Advertisement

More News

True Blue Power and Mid-Continent Instruments and Avionics Power NBAA25 Coverage

Mid-Continent Instruments and Avionics and True Blue Power ANN's NBAA 2025 Coverage... Visit Them At Booth #3436 101 Aviation Nears STC Approval for Lithium Battery Upgrade on Gulf>[...]

ANN's Daily Aero-Term (10.11.25): Hertz

Hertz The standard radio equivalent of frequency in cycles per second of an electromagnetic wave. Kilohertz (kHz) is a frequency of one thousand cycles per second. Megahertz (MHz) >[...]

Aero-News: Quote of the Day (10.11.25)

“NATCA does not endorse, support, or condone any federal employees participating in or endorsing a coordinated activity that negatively affects the capacity of the NAS, or an>[...]

ANN's Daily Aero-Linx (10.11.25)

Aero Linx: European Association for Aviation Psychology (EAAP) Since 1956 the European Association for Aviation Psychology (EAAP) provides a forum for professionals working in the >[...]

NTSB Prelim: Pegasus Quantum 15

Aircraft Experienced A Total Loss Of Engine Power During A Go-Around Attempt And Then Impacted A Soybean Field On September 13, 2025, at 1625 eastern daylight time, a Pegasus Quant>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC