AD: International Aero Engines Turbofan Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Mar 27, 2019

AD: International Aero Engines Turbofan Engine

AD NUMBER: 2019-06-01

PRODUCT: Certain International Aero Engines (IAE) PW1133G-JM, PW1133GA-JM, PW1130G-JM, PW1127G-JM, PW1127GAJM, PW1127G1-JM, PW1124G-JM, PW1124G1-JM, and PW1122G-JM turbofan engines.

ACTION: Final rule; request for comments.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2018-24-01 for the engines listed above.

AD 2018- 24-01 required removing certain low-pressure turbine (LPT) 1st- and 3rd-stage disks from service and replacing with a part eligible for installation.

This AD retains the same requirements as AD 2018- 24-01.

This AD was prompted by the discovery of incorrect serial numbers in the identification of LPT disks in AD 2018-24-01.

DATES: This AD is effective April 10, 2019. Comments must be received by May 10, 2019.

COST: The FAA estimates that this AD affects 0 engines installed on airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Remove and replace LPT 1st or 3rd-stage disk: 0 work-hours × $85 per hour = $0 per engine. Parts: $210,000. Cost per engine: $210,000
FMI: AD

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC