P-8A Aircraft Gets Green Light To Enter Full Rate Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Tue, Jan 28, 2014

P-8A Aircraft Gets Green Light To Enter Full Rate Production

Approval Granted January 3 To Ramp Up From Low Rate Production

On the heels of the P-8A Poseidon squadron’s inaugural deployment, the Maritime Patrol and Reconnaissance Aircraft Program Office (PMA-290) recently announced it entered the full-rate production (FRP) phase of its development. The approval, reached Jan. 3 from the FRP Milestone Decision Authority will allow the program office, resource sponsor, acquisition community and industry to continue to deliver the P-8A to the fleet with the required capabilities needed to ensure the squadrons are getting a stable and efficient system.

"This significant milestone approval moves the program from low-rate into full-rate production, and allows us to manufacture the remaining aircraft over the next several years with an opportunity for a cost-effective procurement," said Cmdr. Tony Rossi, the integrated product team lead for the P-8A program.
 
Aligned under the Naval Air Systems Command, the program's current objective is to deliver 117 aircraft to the fleet. Thirteen of 37 Low Rate Initial Production (LRIP) aircraft have already been delivered to fleet squadrons, with all deliveries on or ahead of schedule. As the Naval Fleet Forces transition to the P-8A, from the P-3C, the Sailors will use these LRIP and future FRP aircraft to train and participate in operational missions.
 
Currently, Patrol Squadron 16 (VP-16), who deployed in December, is equipped with LRIP aircraft. VP-16 and the second squadron with LRIP P-8As will receive their next upgrades through increments 2 and 3, which are the follow-up phases for capabilities for the P-8A aircraft and weapons systems. The next significant milestone for the P-8A program is initial operational capability (IOC) for Increment 2, which is scheduled for 2016, Rossi said.
 
The P-8A’s current configuration, Increment 1, consists of the following capabilities: persistent armed anti-submarine warfare (ASW), an integrated sensor suite, and significant improvement in situational awareness. Increment 2 will consist of multi-static active coherent acoustics, automated identification system, and high-altitude ASW weapon capability.
 
"This FRP milestone is a testament to the incredible effort and dedication of the P-8A team to deliver the P-8A to the fleet as planned,” said Capt. Scott Dillon, PMA-290 program manager. “The team has accomplished a lot over the last six months, from passing the Initial Operational Test and Evaluation period this summer to achieving IOC this fall and the P-8's first operational deployment this winter. We are moving forward with a successful start to 2014 with the announcement of FRP. The high-quality work of the P-8A team has made this milestone possible. We look forward to having continued successes within the program."

(Image provided by NAVAIR)

FMI: www.navair.navy.mil

Advertisement

More News

A ‘Crazy’ Tesla Flying Car is Coming

Musk Claims the Tech Could Be Unveiled Within a Couple of Months Elon Musk is once again promising the impossible…this time, in the form of a Tesla that flies. Speaking on T>[...]

ANN's Daily Aero-Term (11.xx.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.01.25)

"It was pretty dang cool to be in a tube-and-fabric bush plane that high, and it was surreal hearing airline pilots over ATC wondering what a Cub was doing up there. The UL is trul>[...]

ANN's Daily Aero-Linx (11.01.25)

Aero Linx: Lake Amphibian Club Over the years the cost of a new Skimmer or Lake went from about $16,000 to over $500,000 for many reasons. Sales of Renegades have been very sparse >[...]

Classic Aero-TV: EAA Introduces Angle of Attack Training

From 2024 (YouTube Edition): Clinic Aimed to Promote Safe Aircraft Control The EAA Pilot Proficiency Center hosted an angle of attack (AOA) training clinic during the 2024 Oshkosh >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC