Brand New Tower... Same Old Equipment | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Mar 15, 2005

Brand New Tower... Same Old Equipment

ATC Gear In Fort Wayne's New Tower Was Built In 70s

We can't speak to something borrowed, something blue, but there's a lot of old inside the new control tower at Fort Wayne International Airport in Indiana. The $12 million tower is chock-full of equipment on the trailing edge of technology.

The tower is being equipped with the ARTS system (Automated Radar Terminal Systems) -- based on technology first installed in 1974. Originally, the new tower was supposed to house STARS (Standard Terminal Automation Replacement System) gear, but the cost was prohibitive.

"We understand trying to keep costs under control, but it doesn’t seem to make a whole lot of sense," said NATCA spokesman Brad Hiatt.

What's the deal? The answer from the FAA might be gaulling to folks in places like Fort Wayne. "We’re putting the money where the need is greatest," said FAA spokeswoman Elizabeth Corey.

The FAA was originally supposed to spend $970 million to upgrade to the STARS system at airports all over the country. But the upgrade project ran way over budget. Now, the FAA is spending $1.6 billion to install it in just 47 of the busiest airports in the country. Fort Wayne isn't one of them.

"We’re probably 10 years ahead of ourselves in getting the air tower," said Martin Green, aide to Congressman Mark Souder (R-IN). “As a result, the FAA is going to have to catch up with us.” Like Hiatt and Corey, Souder was quoted in the Fort Wayne Journal-Gazette.

"We are disappointed the FAA is considering putting refurbished equipment into the new state-of-the-art facility and we’ll continue to push for the originally programmed STARS equipment," said Airport Executive Director Tory Richardson in a statement to the Journal-Gazette.

FMI: www.fwairport.com

Advertisement

More News

ANN's Daily Aero-Term (07.10.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

NTSB Prelim: Cessna 172

The Airplane Came To Rest Underneath A Set Of Damaged Power Distribution Lines On The Floor Of A Coulee On June 19, 2025, at 1412 mountain daylight time, a Cessna 172K airplane, N7>[...]

ANN's Daily Aero-Linx (07.10.25)

Aero Linx: FAA Managers Association (FAAMA) Recognized by the FAA, FAAMA is a professional association dedicated to the promotion of excellence in public service. The Association i>[...]

Classic Aero-TV: The Big Business of Diminutive Powerplants

From 2023 (YouTube Edition): Jet Central Micro-Turbine Engines Impress Founded in the late-1990s, Mexico City-based Jet Central produces a unique and fascinating line of micro-turb>[...]

Airborne 07.11.25: New FAA Bos, New NASA Boss (Kinda), WB57s Over TX

Also: ANOTHER Illegal Drone, KidVenture Educational Activities, Record Launches, TSA v Shoes The Senate confirmed Bryan Bedford to become the next Administrator of the FAA, in a ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC