Orion Crew Exploration Vehicle Passes Phase 1 Safety Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Jul 07, 2010

Orion Crew Exploration Vehicle Passes Phase 1 Safety Review

Spacecraft Deemed To Meet Critical Human Space Flight Requirements

The Orion crew exploration vehicle has successfully completed the Phase 1 Safety Review of NASA's Human Rating Requirements for space exploration in low Earth orbit and beyond. The NASA/Lockheed Martin Orion team earned the approval from NASA's Constellation Safety & Engineering Review Panel (CSERP) upon completion of the review, an essential requirement for the Orion program to move forward to the Critical Design Review and Phase 2 Safety Review.

The safety review process is a rigorous and exhaustive look at the design and operational concepts to assure that all requirements have been adequately met. System safety requirements address potentially catastrophic failures that could result in loss of crew or loss of mission during launch, ascent to orbit, approach and docking to the International Space Station, re-entry, landing, and recovery operations. Thoroughly reviewing spacecraft designs and operations for possible causes of such catastrophic failures, and designing appropriate mitigations for them, is a critical part of NASA's human rating program.


Orion Crew Module Under Construction

"Completing this significant safety review puts Orion well down the road in satisfying the requirements to minimize the nation's gap in human space flight," said Paul Benfield, Lockheed Martin Integrated Reliability & Safety Manager for the Orion Program. "NASA's current human rating standards include stringent requirements and thorough procedures developed from the best practices of NASA's past 50 years of human spaceflight."

Benfield noted that human rating a vehicle for beyond low Earth orbit (LEO) is particularly challenging given the greater autonomy of such a mission, the extended mission durations, and increased time to return to Earth. This Phase 1 Safety milestone covers the requirements for Orion missions in LEO as well as sortie missions to the moon. The design enables a six-month on-orbit duration which is vital to assure return capability of the space station crew, as well as support autonomous lunar orbit operations. This long duration design far exceeds the one- to two-week capabilities offered by other potential providers.


Artist's Rendering

"Human rating a spacecraft is not a feature you can just simply add on once the vehicle is designed," explained Benfield. "It is a process that requires endurance and attention to detail to ensure that safety is driven into every aspect of the vehicle design and operations from the beginning. Optimal safety and reliability is strategically and systematically incorporated into the vehicle from day one, concurrent with critical trade decisions considering vehicle mass and cost."

FMI: www.nasa.gov, www.lockheedmartin.com

Advertisement

More News

NTSB Final Report: Cozy Cub

Witness Reported The Airplane Was Flying Low And Was In A Left Bank When It Struck The Power Line Analysis: The pilot was on final approach to land when the airplane collided with >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Seated On The Edge Of Forever -- A PPC's Bird's Eye View

From 2012 (YouTube Edition): A Segment Of The Sport Aviation World That Truly Lives "Low And Slow" Pity the life of ANN's Chief videographer, Nathan Cremisino... shoot the most exc>[...]

ANN's Daily Aero-Linx (04.29.25)

Aero Linx: International Business Aviation Council (IBAC) IBAC promotes the growth of business aviation, benefiting all sectors of its industry and in all regions of the world. As >[...]

ANN's Daily Aero-Term (04.29.25): Execute Missed Approach

Execute Missed Approach Instructions issued to a pilot making an instrument approach which means continue inbound to the missed approach point and execute the missed approach proce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC