AD: Pilatus PC-7/12 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Feb 19, 2004

AD: Pilatus PC-7/12

AD NUMBER: 2004-04-01

MANUFACTURER: Pilatus
SUBJECT: Engine-driven fuel pump
SUMMARY: The FAA adopts a new airworthiness directive (AD) that supersedes AD 2002-01-09, which applies to all Pilatus Aircraft Ltd. (Pilatus) Models PC-7, PC-12, and PC-12/45 airplanes that incorporate a certain engine-driven pump. AD 2002-01-09 currently requires you to inspect the joints between the engine-driven pump housing, the relief valve housing, and the relief valve cover for signs of fuel leakage and extruding gasket material; replace any engine-driven pump with any of the above problems; and ensure that the relief valve attachment screws are adequately torqued and re-torque as necessary. This AD is the result of mandatory continuing airworthiness information (MCAI) issued by the airworthiness authority for Switzerland. This AD retains the actions from AD 2002-01-09, adds certain engine-driven pumps to the applicability, and requires eventual replacement of the pump with an improved design pump to assure that the unsafe condition does not recur. We are issuing this AD to detect and correct gasket material extruding from the engine-driven pump housing and detect and correct relief valve attachment screws with inadequate torque. These conditions could lead to fuel leakage and result in a fire in the engine compartment.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20040401

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC