Preps Continue Toward a Targeted February 7 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.09.24

Airborne-NextGen-12.10.24

Airborne-Unlimited-12.11.24

Airborne AffordableFlyers-12.12.24

Airborne-Unlimited-12.13.24

Fri, Jan 15, 2010

Preps Continue Toward a Targeted February 7 Launch

Recent Cold Weather In Florida Has Made For Special Precautions

At NASA's Kennedy Space Center in Florida, workers at Launch Pad 39A began loading fuel into space shuttle Endeavour's orbital maneuvering system and auxiliary power units. The process was expected to be completed Thursday.

Cold weather in Florida has been an issue as technicians continue prelaunch propellant loading on space shuttle Endeavour at Launch Pad 39A.

NASA managers weighed all options and have decided to continue working toward a Feb. 7 launch with full mission content. A decision was made to select an alternate hose design, assembled from shorter hoses that were previously certified and tested, for use aboard the station as the primary jumper.

Also, managers decided on the accelerated development of a redesigned set of hoses, based on the design that failed, for use in the event a problem arises with the new primary design. Discussions were discontinued related to partial activation of the Tranquility module.

The payload for the STS-130 mission, consisting of the Italian-built Tranquility node and its attached cupola, will be transported to the pad beginning at 0400 EST Saturday. Once there, it will be lifted and stored in the payload changeout room.

Near NASA's Johnson Space Center in Houston, Mission Specialists Nicholas Patrick and Robert Behnken will be immersed in the massive pool in the Neutral Buoyancy Lab to practice techniques for their first spacewalk. Meanwhile, Commander George Zamka and Pilot Terry Virts will practice shuttle landings at White Sands Space Harbor in Las Cruces, N.M., in the Shuttle Training Aircraft.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (12.11.24): Altitude Restriction

Altitude Restriction An altitude or altitudes, stated in the order flown, which are to be maintained until reaching a specific point or time. Altitude restrictions may be issued by>[...]

ANN's Daily Aero-Linx (12.11.24)

Aero Linx: USAF--Low-Altitude Flying Training The Federal Aviation Administration manages U.S. airspace and is responsible for the development and enforcement of rules for aircraft>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

Airborne 12.09.24: Moon Delays, AirVenture Tkts, Color Vision Testing

Also: Russian National Arrested, DTW’s Instrument Approach, Bankruptcy Reform, Bessie Coleman WAI Hard to believe, but NASA has delayed the Artemis II and Artemis III mission>[...]

Airborne 12.06.24: NJ Drone TFR, Isaacman For NASA Admin, MORE Boeing Woes

Also: Gogo Owns Satcom Direct Now, Airbus Cuts Jobs, A319 Firefighters, CAP Balloon Challenge The FAA has confirmed it issued two Temporary Flight Restrictions (TFRs) in New Jersey>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC