AD: Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Apr 05, 2010

AD: Boeing

AD NUMBER: 2010-07-03

MANUFACTURER: The Boeing Company Model 747-200C and - 200F Series Airplanes
SUBJECT: Airworthiness Directive 2010-07-03

SUMMARY: The FAA is superseding an existing airworthiness directive (AD), which applies to certain Model 747-200C and -200F series airplanes. That AD currently requires repetitive inspections to find fatigue cracking in the floor panel attachment fastener holes of the upper chord of certain upper deck floor beams in Section 41 (i.e., body station 520 and forward), and repair if necessary. The existing AD also provides optional modifications, which extend the threshold for initiating certain repetitive inspections. This new AD requires additional repetitive inspections to find fatigue cracking in the floor panel attachment fastener holes of the upper chord of certain other upper deck floor beams in Section 41 and Section 42 (i.e., aft of body station 520); repetitive inspections to find fatigue cracking in the permanent fastener holes of the upper chord of certain upper deck floor beams in Section 41; and related investigative and corrective actions. This new AD also provides a new optional modification, which terminates certain repetitive inspections. This AD results from new reports of cracking in the upper chord of the upper deck floor beams in Sections 41 and 42, and new analysis that shows the permanent fastener holes of the upper chord of certain upper deck floor beams in Section 41 are also susceptible to fatigue cracking. We are issuing this AD to detect and correct cracking in the upper chord of the upper deck floor beams. Such cracking could extend and sever the floor beams, which could result in rapid decompression and loss of controllability of the airplane.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/CC745B3DCD4E0CB5862576F900552839?OpenDocument

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

ANN's Daily Aero-Linx (07.03.25)

Aero Linx: Colorado Pilots Association (CPA) Colorado Pilots Association was incorporated as a Colorado Nonprofit Corporation in 1972. It is a statewide organization with over 700 >[...]

ANN's Daily Aero-Term (07.03.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC