VH-92A Program Team Conducts Critical Design Review (CDR) | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.01.25 (Holiday)

Airborne-Unlimited-09.02.25

AirborneNextGen-09.03.25

Airborne-Unlimited-09.04.25

AirborneUnlimited-08.22.25

Mon, Aug 01, 2016

VH-92A Program Team Conducts Critical Design Review (CDR)

Ready To Proceed To Assembly, Test And Evaluation

The VH-92A Presidential Helicopter Replacement Program has passed its Critical Design Review (CDR), signaling the program is ready to proceed to assembly, test and evaluation.

The joint Sikorsky/Naval Air Systems Command (NAVAIR) VH-92A helicopter program team met in July with key collaborators from government and industry for an in-depth design review.

Throughout the review the VH-92A program team successfully demonstrated that the design meets the system requirements.  Review participants included NAVAIR and industrial partners who took part in the technical presentations.

"This milestone is an important achievement for our program and demonstrates Sikorsky and NAVAIR are well aligned," said Spencer Elani, Sikorsky director, VH-92A helicopter program. "We got here by completing several milestones on or ahead of schedule. We are committed to staying on that track as we head into the building phase of the program."

The U.S. Navy awarded a $1.24 billion fixed-price incentive Engineering and Manufacturing Development (EMD) contract with production options to Sikorsky on May 7, 2014, for 21 operational and two test aircraft.

Initial fielding is planned for 2020, with production concluding in 2023. Under the contract, Sikorsky will use its production S-92 aircraft and integrate government defined mission systems and an executive interior.

"This is an important step forward in the replacement of our presidential fleet of helicopters. The successful CDR demonstrates this helicopter system meets the requirements of the USMC and gives them exceptional mission performance from a platform that is affordable and supportable for this important mission," said U.S. Marine Corps Col. Robert Pridgen, program manager for the Naval Air System Command's Presidential Helicopter's Program Office.

Two Engineering Development Model (EDM) aircraft are undergoing the modification process at Sikorsky's Stratford, Conn., location. First flight of a VH-92A configured aircraft is planned for 2017.

The VH-92A will transport the president and vice president of the United States and other officials. Sikorsky brings unmatched experience and a proven track record to this mission having flown every US commander-in-chief since President Dwight D. Eisenhower. The VH-92A will continue this legacy for decades to come.

(Image provided with Lockheed Martin news release)

FMI: www.lockheedmartin.com

Advertisement

More News

Classic Aero-TV: Brazilian Hummingbird Alights in U.S.

From 2023 (YouTube edition): The Resurgent Gyroplane Existing at the confluence of the airplane, the helicopter, and the pinwheel, the machine known alternately as the autogiro and>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

ANN's Daily Aero-Linx (09.01.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

ANN's Daily Aero-Term (09.01.25): Receiver Autonomous Integrity Monitoring

Receiver Autonomous Integrity Monitoring (RAIM) A technique whereby a civil GNSS receiver/processor determines the integrity of the GNSS navigation signals without reference to sen>[...]

NTSB Prelim: Rockwell International 112

...Attempted To Reach The Runway But Landed About 15 Ft Short And Impacted A Berm On July 23, 2025, about 1300 eastern daylight time, N112EF, a Rockwell International 112 airplane,>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC