Atlantis Nearly Ready For The Pasture | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, May 26, 2010

Atlantis Nearly Ready For The Pasture

Set To Return From Her Final Mission Wednesday

Atlantis astronauts stowed spacesuits, wrapped up the standard late inspection of the shuttle's thermal protection system ahead of schedule and enjoyed some time off Monday.


Atlantis Docked At ISS

Commander Ken Ham, Pilot Tony Antonelli and Mission Specialists Garrett Reisman and Piers Sellers began the inspection well ahead of scheduled start. By 4:50 a.m. they had finished their look at the right wing, by 5:52 a.m. the nose cap survey was complete and the left wing survey was finished at 7:17:a.m., about 2.5 hours ahead of the timeline.

The survey was done using the shuttle arm and its 50-foot extension, the orbiter boom sensor system. Early in the mission, a pan-tilt assembly at the boom's end supporting a laser dynamic range imager and an intensified video camera had been partly disabled by a snagged cable.

A secondary system on the boom was used for the day-after-launch survey, and spacewalkers cleared the cable snag on Wednesday. The pan-tilt assembly and its instruments functioned flawlessly today. The results will be analyzed on the ground before Atlantis is formally cleared to land.


Atlantis Landing STS129

Spacewalkers Mike Good and Steve Bowen finished working with the spacesuits and put them away while the survey was being done. After the survey the boom and the arm were stowed on opposite sides of the cargo bay sill, their work done for the mission.

Tuesday crew members stowed items in the cabin and checked out Atlantis' reaction control system and its flight control surfaces. Landing at Kennedy Space Center is scheduled for 0748 Wednesday. 

FMI: www.nasa.gov

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC