DARPA Awards Contract To Study On-Orbit Satellite Assembly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Sep 08, 2015

DARPA Awards Contract To Study On-Orbit Satellite Assembly

System Would Enable Robotic Assembly Of Large Satellites In Space

DARPA has awarded a contract to Space Systems/Loral to study on-orbit robotic assembly of geostationary communications satellites. Called Dragonfly, the program is designed to enable larger and more powerful satellites that cannot be launched fully assembled, to be packaged in pieces within a standard launch vehicle fairing. 

“The Dragonfly program gives SSL the opportunity to demonstrate our advanced robotics capabilities with a mission that has the potential to transform the way satellites are built,” said John Celli, president of SSL. “SSL has a track record of partnering with DARPA on cost-effective developments that leverage commercial practices and apply to both military and commercial use.”

As one of the world’s most prolific manufacturers of geostationary communications satellites, SSL brings a wealth of expertise to the Dragonfly study including heritage robotics. The Dragonfly concept, which is designed to have both military and commercial applications, is for satellites to self-assemble from an efficiently stowed state while in orbit with a focus on the installation and reconfiguration of large radio frequency (RF) antenna reflectors.

The study is scheduled for a five-month first phase during which SSL will seek to demonstrate how assembling satellites on orbit could lower satellite cost and mass, while at the same time enabling higher satellite performance. SSL is planning to further develop on-orbit satellite assembly capability and as part of this effort, has submitted a proposal to NASA for collaboration on taking the concept to a ground demonstration followed by a flight application.

FMI: www.sslmda.com

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC