Boeing Completes 787 Dreamliner Static Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.02.25

Airborne-NextGen-06.03.25

AirborneUnlimited-06.04.25

Airborne-AffordableFlyers-06.05.25

AirborneUnlimited-06.06.25

Mon, Nov 30, 2009

Boeing Completes 787 Dreamliner Static Test

Closer... Closer...

Boeing has just completed the static test necessary to validate the side-of-body modification made to the 787 Dreamliner. The company expects a full analysis of the test results to be concluded in approximately 10 days. A successful test result is needed to clear the airplane for its planned first flight next month.

During the Monday test on the 787 Dreamliner static test airframe, the wing and trailing edges of the airframe were subjected to its limit load -- the highest loads expected to be seen in service. The load is about the same as 2.5 times the force of gravity for the wing.

Boeing announced on June 23 that it was necessary to reinforce an area of structure at the side-of-body section of the 787. The modification entails installing new fittings at 34 stringer locations within the joint where the wing is attached to the fuselage. The modifications were completed on the first two flight-test airplanes and the full-scale static test airplane earlier this month.

"Today's test was an important milestone for the program. We will confirm the test results after the completion of our detailed analysis," said Scott Fancher, vice president and general manager of the 787 program.

FMI: www.boeing.com

Advertisement

More News

Citation Operators Get Another Flight Data Connection for QA

LinxUs System Adds Capabilities for Data-Driven Operators Textron Aviation announced another option for operators processing their post-flight data, adding interoperability with GE>[...]

ANN's Daily Aero-Linx (06.01.25)

Aero Linx: The de Havilland Moth Club Ltd The de Havilland Moth Club evolved from a belief that an association of owners and operators of Moth aeroplanes should be formed to create>[...]

NTSB Final Report: Bellanca 8GCBC

(Pilot) Inadvertently Applied Excessive Braking Action, And The Airplane Nosed Over Analysis: The pilot reported that, while landing at a remote, rough and uneven airstrip in a tai>[...]

Aero-News: Quote of the Day (06.01.25)

“MCADT is committed to rapidly integrating armed first-person view drones into the FMF, enhancing small-unit lethality and providing organic capabilities that warfighters cur>[...]

Classic Aero-TV: High-Speed Match-up - Venom and GE Rebirth A Legend

From 2017 (YouTube Edition): Major Engine Supplier Joins Forces With Small Aircraft Manufacturer… GE recently made an agreement with Venom Aircraft to supply engines for the>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC