NASA Issues RFP For Ares I Upper Stage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Sun, Feb 25, 2007

NASA Issues RFP For Ares I Upper Stage

Awards Turbine Pump Assembly To Hamilton Sundstrand

The plan for NASA's next generation space vehicle is starting to come together. On Friday, the space agency issued a request for proposal for the Ares I launch vehicle upper stage element. Ares I is the launch vehicle that will transport the Orion crew exploration vehicle and its crew and cargo to low Earth orbit.

The upper stage proposals are due to Marshall Space Flight Center no later than 1 p.m. CST April 13, 2007.

The request for proposal states the procurement approach for obtaining the upper stage element. The selected contractor will produce the required Ares I upper stage and provide support to a NASA-led design team during the design phase.

The contract will provide for the manufacture and assembly of test articles, flight test units, and the operational upper stage elements to support NASA's flight manifest through 2016. Final manufacturing and assembly will take place at NASA's Michoud Assembly Facility in Louisiana.

The Ares I upper stage, with a separately procured upper stage engine and a separately procured instrument ring, will provide the navigation, guidance, control and propulsion required for the second stage of the Ares I ascent.

The first stage will consist of a single reusable solid rocket booster and motor similar to those used on the space shuttle but with a fifth motor segment attached.

The contract to manufacture and assemble the Ares I upper stage element will be awarded through a full and open competition and managed by NASA's Marshall Space Flight Center in Huntsville, AL.

A selection will be made in August 2007.

NASA also announced Friday it selected Hamilton Sundstrand Space Systems International Inc. of Rockford, IL to design, develop, fabricate, test and deliver engineering models of a turbine pump assembly for the Ares I upper stage thrust vector control subsystem.

That two year, cost-plus-fixed-fee contract is worth approximately $5 million.

FMI: View The RFP, www.nasa.gov/ares

Advertisement

More News

1st Annual Affordable Flying Exposition Gets Its Footing

“Big Things Have Small Beginnings” Set for November 6–8, 2025 at Lakeland Linder International Airport (LAL) in Lakeland, Florida, the first-ever Affordable Flyin>[...]

Aero-News: Quote of the Day (11.04.25)

“Backed by 90 years of Jeppesen’s gold-standard data and ForeFlight’s relentless spirit of exploration, this combination is building the most unified, intuitive p>[...]

Aero-News: Quote of the Day (11.05.25)

“Our strategic partnership with AutoFlight, backed by their substantial technological expertise and tangible advancements in eVTOL airworthiness, represents a significant mil>[...]

Airborne 10.30.25: Earhart Search, SpaceX Speed Limit, Welcome Back, Xyla!

Also: Beech M-346N, Metro Gains H160 EMS STC, New Bell Boss, Affordable Flying Expo Tickets NOW On Sale! Purdue University’s Research Foundation and the Archaeological Legacy>[...]

ANN's Daily Aero-Linx (11.05.25)

Aero Linx: British Gliding Association (BGA) The British Gliding Association is the governing body for the sport of gliding in the UK and members are the 76 clubs that provide glid>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC