2nd Ariane 5 To Be Launched This Year Enters Assembly Process | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Mar 11, 2010

2nd Ariane 5 To Be Launched This Year Enters Assembly Process

Ariane Plans A Total Of Seven Mission In 2010

The Ariane 5 for Arianespace's second dual-payload flight of 2010 has begun its assembly as the Spaceport in French Guiana is once again the center of activity for two parallel missions.

This latest Ariane 5 began taking shape earlier in the week as its cryogenic core stage was positioned over a mobile launch table in the Spaceport's Launcher Integration Building. It was then joined by the vehicle's two solid boosters for mating.

The second mission of 2010 will utilize a heavy-lift Ariane 5 ECA version of Arianespace's workhorse launcher, and will carry two telecommunications satellites.

As the launch campaign begins for this flight, another Ariane 5 ECA is in the Spaceport's Final Assembly Building, where it is awaiting the integration of its two satellite passengers: ASTRA 3B & COMSATBw-2. The liftoff of this year-opening Arianespace launch is set for March 24.

Arianespace is targeting a total of seven Ariane 5 missions during 2010 while preparations also continue for the upcoming introductions of the medium-lift Soyuz and lightweight Vega launcher in side-by-side operations at the Spaceport.

FMI: www.arianespace.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC