FAA Decision On Commercial Flights At Paine Field May Come Friday | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Sep 14, 2012

FAA Decision On Commercial Flights At Paine Field May Come Friday

Two Regional Carriers Looking To Set Up Shop At Snohomish County Airport

The FAA has scheduled September 14 as the release date for its decision as to whether to allow commercial flights at Paine Field in Everett, WA. The airport is home to Boeing's main assembly plant, but has otherwise been traditionally considered a GA airport.

Horizon Air and Allegiant Air have both petitioned the FAA for the right to operate scheduled services at Paine Field, and they've been waiting for a decision for a long time. The Mukileto Beacon reports that an initial Environmental Assessment (EA) report was completed in December, 2009, and opened up for comments. At that time, the FAA said they would have a determination in "a few months."

The EA examined the impacts that commercial flights would have on the surrounding area in terms of air quality, traffic, and of course, noise. The 2009 draft EA said there would be no significant impact from allowing commercial operations at Paine Field.

The primary opponent of allowing scheduled air service at the airport is a group called "Save Our Communities" (SOC). The group's vice president Greg Hauth said that its primary concern is that once scheduled air service is allowed, there are "laws on the books that allow unrestricted growth at an airport." Hauth says that the draft EA did not take into account growth in the number of scheduled flights beyond an initial 12 per day. He said that the FAA purposely limited the scope of the study to avoid having to do a full Environmental Impact Statement as would have been required by the National Environmental Policy Act.

As to the delay, FAA spokesman Mike Fergus said that it had taken that long to digest the more than 900 comments that were received on the draft EA. Comments on the final EA will be open through October 14.

(Paine Field image from file)

FMI: Final Proposal, www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC