SpaceX Steps Up Efforts To Recapture Fairings | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.28.24

Airborne-NextGen-10.29.24

Airborne-Unlimited-10.30.24

Airborne-Unlimited-10.24.24

Airborne-Unlimited-10.25.24

Fri, Oct 18, 2019

SpaceX Steps Up Efforts To Recapture Fairings

Adds Second Ship For Recovering The Components To Its Fleet

SpaceX has added a second ship designed to recover fairings from its launch vehicles to its fleet. The Ms. Chief joins the Ms. Tree in the company's efforts to make as many components of its spacecraft as possible reusable.

The website Inverse.com reports that collecting the multi-million-dollar fairings, which protect payloads during launch, has proven to be problematic. The ships are equipped with large nets that are positioned where it is anticipated that the fairings will return to Earth, snagging them as they fall. If they can be captured, they can be reused, further reducing the cost of launches provided by the company.

The fairings return to Earth at about Mach 8. But for a long time, the ship Mr. Steven, now known as Ms. Tree, was unable to retrieve any of the fairings despite being fitted with guidance systems and other tracking devices.

Ms. Tree, and Ms. Chief, are fitted with larger nets which cover nearly an acre. New arms have been installed to make the nets "springy, like a highly-damped trampoline."

The upgraded Ms. Tree was able to recover a fairing half during the Space Test Program-2 mission. She caught another fairing after the launch of the AMOS-17 mission.

But it may be awhile before SpaceX will have another chance to test the ships. Teslarati reports that there are no hard dates for upcoming launches that would allow another attempt. That does, however, give SpaceX an opportunity to fine-tune the system.

(Image provided by SpaceX)

FMI: Source report

Advertisement

More News

Senator Pushes FAA to Accelerate Rocket Launch Licensing

States That Current Process is Damaging National Aerospace Development US Senator Jerry Morgan is pushing the FAA to speed up the process for rocket launch licensing. He argues tha>[...]

Classic Aero-TV: RJ Gritter - Part of Aviation’s Bright New Future

From 2015 (YouTube Edition): Model Aviator Aims For Full-Scale Career While at the 2015 Indoor Electric RC Festival, referred to as eFest, ANN CEO and Editor-In-Chief, Jim Campbell>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (10.27.24)

Aero Linx: Cardinal Flyers Online The Cardinal Flyers Online Web site was created and is maintained by me, Keith Peterson. My wife Debbie and I have owned a 1976 RG since 1985. Wit>[...]

ANN's Daily Aero-Term (10.27.24): Clearance Void If Not Off By (Time)

Clearance Void If Not Off By (Time) Used by ATC to advise an aircraft that the departure release is automatically canceled if takeoff is not made prior to a specified time. The exp>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC