Rockwell Collins To Activate P-8A Radio Components Depot Capability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Nov 24, 2016

Rockwell Collins To Activate P-8A Radio Components Depot Capability

Partnership Allows For Streamlined Service And Support

The U.S. Navy has awarded $27 million contract to Rockwell Collins to activate a depot capability for the U.S. Navy P-8A Poseidon aircraft HF-121C and miscellaneous radio components. Under contract through 2020, establishing this depot capability creates military jobs, reduces the repair pipeline and improves availability of aircraft.

“Establishing a depot capability allows our customers to service their own equipment and shorten turnaround time,” said Thierry Tosi, vice president and general manager, Service Solutions for Rockwell Collins. “In addition, the capability allows for enhanced mission readiness and support to the warfighter.”

Delivered in a three-phased approach, the P-8A Poseidon radio component depot capability initially began with an assessment to determine the necessary requirements. The partnership is currently in an activation stage, or the second phase, which involves the knowledge and tools transfer to support the radio components to U.S. Navy personnel. Phase three involves a sustainment plan and likely a public-private partnership.

The HF-121C airborne high frequency (HF) communication system is designed for HF applications requiring voice and data operations at 400W transmit power. The HF-121C and other radio components provide maximum performance to the P-8A Poseidon, allowing for fast and secure data transfer, making it a critical onboard capability.

Work will be performed at the Naval Air Station's Fleet Readiness Center Southwest in North Island, CA.

(Image provided with Rockwell Collins news release)

FMI: www.rockwellcollins.com, www.navy.mil

Advertisement

More News

ANN's Daily Aero-Linx (12.12.25)

Aero Linx: Commercial Aviation Safety Team (CAST) Founded in 1997, the Commercial Aviation Safety Team (USCAST) has developed an integrated, data-driven strategy to reduce the comm>[...]

ANN's Daily Aero-Term (12.12.25): Land And Hold Short Operations

Land And Hold Short Operations Operations that include simultaneous takeoffs and landings and/or simultaneous landings when a landing aircraft is able and is instructed by the cont>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

NTSB Final Report: Cirrus Design Corp SF50

Pilot’s Inadvertent Use Of The Landing Gear Control Handle Instead Of The Flaps Selector Switch During The Landing Rollout Analysis: The pilot reported that during the landin>[...]

Airborne 12.08.25: Samaritan’s Purse Hijack, FAA Med Relief, China Rocket Fail

Also: Cosmonaut Kicked Out, Airbus Scales Back, AF Silver Star, Russian A-60 Clobbered A Samaritan’s Purse humanitarian flight was hijacked on Tuesday, December 2, while atte>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC