Rockwell Collins To Activate P-8A Radio Components Depot Capability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneUnlimited-
10.14.25

Airborne-Unlimited-10.15.25

Airborne-NextGen-10.16.25

AirborneUnlimited-10.17.25

Thu, Nov 24, 2016

Rockwell Collins To Activate P-8A Radio Components Depot Capability

Partnership Allows For Streamlined Service And Support

The U.S. Navy has awarded $27 million contract to Rockwell Collins to activate a depot capability for the U.S. Navy P-8A Poseidon aircraft HF-121C and miscellaneous radio components. Under contract through 2020, establishing this depot capability creates military jobs, reduces the repair pipeline and improves availability of aircraft.

“Establishing a depot capability allows our customers to service their own equipment and shorten turnaround time,” said Thierry Tosi, vice president and general manager, Service Solutions for Rockwell Collins. “In addition, the capability allows for enhanced mission readiness and support to the warfighter.”

Delivered in a three-phased approach, the P-8A Poseidon radio component depot capability initially began with an assessment to determine the necessary requirements. The partnership is currently in an activation stage, or the second phase, which involves the knowledge and tools transfer to support the radio components to U.S. Navy personnel. Phase three involves a sustainment plan and likely a public-private partnership.

The HF-121C airborne high frequency (HF) communication system is designed for HF applications requiring voice and data operations at 400W transmit power. The HF-121C and other radio components provide maximum performance to the P-8A Poseidon, allowing for fast and secure data transfer, making it a critical onboard capability.

Work will be performed at the Naval Air Station's Fleet Readiness Center Southwest in North Island, CA.

(Image provided with Rockwell Collins news release)

FMI: www.rockwellcollins.com, www.navy.mil

Advertisement

More News

Airborne 10.15.25: Phantom 3500 Confounds, Citation CJ3 Gen2 TC, True Blue Power

Also: Kodiak 100 Joins USFS, Innovative Solutions & Support Renamed, Gulfstream Selects Honeywell, Special Olympics Airlift The Phantom 3500 mockup made an appearance where the>[...]

Airborne 10.14.25: Laser Threat, VeriJet BK, Duffy Threatens Problem Controllers

Also: USAF Pilots, Atlanta Tower Evac, Archer Spotlight Dissipates, Hop-A-Jet Sues A social-media call for people to point lasers at aircraft flying over Portland’s ICE facil>[...]

Aero-News: Quote of the Day (10.20.25)

“We developed this prototype from concept to reality in under a year. The U-Hawk continues the Black Hawk legacy of being the world’s premier utility aircraft and opens>[...]

ANN's Daily Aero-Term (10.20.25): Flameout Pattern

Flameout Pattern An approach normally conducted by a single-engine military aircraft experiencing loss or anticipating loss of engine power or control. The standard overhead approa>[...]

NTSB Final Report: Schweizer SGS 2-33A

Student Pilot’s Failure To Maintain Airspeed And Altitude Resulting In A Collision With The Ground During The Base To Final Turn Analysis: The solo student pilot reported she>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC