AD: Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Aug 30, 2007

AD: Boeing

AD NUMBER: PL2007-18-52
MANUFACTURER: Boeing
SUBJECT: Airworthiness Directive PL2007-18-52
SUMMARY:
Since the issuance of emergency AD 2007-18-51, we have received additional reports of parts coming off the main slat track downstop assemblies.

In these cases, the parts were found in the bottom of the slat track housing ("slat can"). Additionally, in one case, the slat can was damaged. Based on this new information, we find that the 24-day compliance time specified in AD 2007-18-51 for accomplishing the detailed inspection of each main slat track downstop assembly to verify proper installation of the slat track hardware is not adequate to address the unsafe condition.

We have determined that the appropriate compliance time for this inspection is 10 days after receipt of this new AD.

In addition, we have determined that an inspection using borescope techniques in lieu of a detailed inspection is acceptable.

Further, we have determined that by performing the initial detailed or borescope inspection within the reduced compliance time of 10 days, the compliance time for torquing the nut and bolt can remain at 24 days after receipt of AD 2007-18-51.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC