Investigation Of The Fire Onboard ZA002 Continuing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-08.25.25

Airborne-NextGen-08.26.25

AirborneUnlimited-08.27.25

Airborne-AffordableFlyers-08.28.25

AirborneUnlimited-08.22.25

Fri, Nov 12, 2010

Investigation Of The Fire Onboard ZA002 Continuing

Company Reports Significant Damage To Electrical Panel

Boeing is continuing its investigation of Monday's incident on flight test Dreamliner ZA002. The company said Thursday they have determined that a failure in the P100 panel led to a fire involving an insulation blanket. The insulation self-extinguished once the fault in the P100 panel cleared. The P100 panel on ZA002 has been removed and a replacement unit is being shipped to Laredo. The insulation material near the unit also has been removed.


ZA002 File Photo

Damage to the ZA002 P100 panel is reported to be significant. Boeing says that initial inspections, however, do not show extensive damage to the surrounding structure or other systems, but the inspection of that area of the airplane is not yet complete.

The P100 panel is one of several power panels in the aft electronics bay. It receives power from the left engine and distributes it to an array of systems. In the event of a failure of the P100 panel, backup power sources – including power from the right engine, the Ram Air Turbine, the auxiliary power unit or the battery – are designed to automatically engage to ensure that those systems needed for continued safe operation of the airplane are powered. The backup systems engaged during the incident and the crew retained positive control of the airplane at all times and had the information it needed to perform a safe landing.


Dreamliner File Photo

Molten metal has been observed near the P100 panel, which is not unexpected in the presence of high heat. Boeing says that the presence of this material does not reveal anything meaningful to the investigation. Inspection of the surrounding area will take several days and is ongoing. The company says it is too early to determine if there is significant damage to any structure or adjacent systems.

As part of the investigation, Boeing says it will conduct a detailed inspection of the panel and insulation material to determine if they enhance our understanding of the incident. "We continue to evaluate data to understand this incident," the company said in a statement. "At the same time, we are working through a repair plan. In addition, we are determining the appropriate steps required to return the rest of the flight test fleet to flying status."

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (08.27.25)

Aero Linx: The American Society of Aerospace Medicine Specialists (ASAMS) The Society is a non-profit organization created to serve as a voice for and represent the professional ne>[...]

ANN's Daily Aero-Term (08.27.25): Class C Service

Class C Service This service provides, in addition to basic radar service, approved separation between IFR and VFR aircraft, and sequencing of VFR aircraft, and sequencing of VFR a>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Airborne-NextGen 08.26.25: Iran UAV Knockoffs, X-37B Spaceplane, Army Training

Also: ERAU Uses UAVs, P550 Group 2 UAS, Starship’s Florida Launches, NASA Missions Chopped The Air Force has put out a call to commission a one-to-one copy of the Iranian-des>[...]

Classic Klyde Morris (08.25.25)

Classic Klyde Morris From 11.07.16 (and Remembering Bob...) FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC