Bell Boeing Delivers First Modified Osprey For Improved Fleet Readiness | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Dec 14, 2019

Bell Boeing Delivers First Modified Osprey For Improved Fleet Readiness

Upgrade Reduces Configuration Types To Streamline Maintenance And Repairs

Boeing and Bell Textron have delivered the first modified MV-22 Osprey to the United States Marine Corps for improved readiness and reliability of the tiltrotor fleet.

The Marines have multiple configurations of the MV-22 aircraft in service. Under the Common Configuration – Readiness and Modernization (CC-RAM) program, Bell Boeing is reducing the number of configurations by upgrading block “B” aircraft to the current block “C” configuration.

“Our first CC-RAM aircraft returning to Marine Corps Air Station New River was a key program benchmark,” said U.S. Marine Corps Col. Matthew Kelly, program manager, V-22 Joint Program Office (PMA-275). “We are excited to see the capability, commonality and readiness improvements these CC-RAM aircraft bring to the fleet as part of the Marine Corps’ V-22 readiness program.”

As a block “B” configuration, this MV-22 was originally delivered to the fleet in 2005. In 2018, the aircraft flew from Marine Corps Air Station New River to the Boeing Philadelphia facility for modernization.

“This milestone marks the beginning of an Osprey evolution,” said Kristin Houston, vice president, Boeing Tiltrotor Programs and director, Bell Boeing V-22 Program. “Through a shared focus on safety and quality, the Bell Boeing team is delivering modernized MV-22 aircraft that are ready to serve our dedicated servicemen and women who rely on this essential aviation resource.”

The next CC-RAM delivery is expected in early 2020.

“We look forward to having the remaining MV-22 block “B” aircraft rejoin the fleet in a block “C” configuration,” said Kelly.

In November 2019, the U.S. Navy awarded Bell Boeing $146,039,547 to upgrade nine additional MV-22 aircraft under the CC-RAM program, with work expected to be completed in March 2022.

(Image provided with Boeing news release)

FMI: www.boeing.com

Advertisement

More News

Aero-News: Quote of the Day (12.09.25)

“We respectfully call on the City of Mesa to: 1. Withdraw the landing fee proposal immediately 2. Engage with the aviation community before making decisions that impact safet>[...]

ANN's Daily Aero-Term (12.09.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.09.25)

Aero Linx: International Federation of Airworthiness (IFA) IFA uniquely combines together all those with responsibility for policies, principles and practices concerned with the co>[...]

NTSB Final Report: Diamond Aircraft Ind Inc DA20C1 (A1); Robinson Helicopter R44

Controller’s Expectation That VW02 Would Have Departed Sooner Led To An Inadequate Scan And Loss Of Situational Awareness Analysis: A Robinson R-44 helicopter N744AF, VW02 (V>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC