EASA Certifies AW189 Full Ice Protection System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jul 12, 2016

EASA Certifies AW189 Full Ice Protection System

Certification Clears Way For All-Weather Operations

EASA has certified the Full Ice Protection System (FIPS) for the AW189, clearing the way for the aircraft to operate in full icing conditions.

The EASA certification comes after three years of flight trials in Northern Europe and North America, during the winter months, to gather data and test the effectiveness of the system which includes electrically heated main and tail rotor blades, heated windscreens and an ice detection system. The standard AW189 helicopter already includes an engine air intake heating system. The system is fully automatic once switched on by the pilot, allowing the pilot to concentrate on other flying activities.

The FIPS is critical for operators flying in Northern Europe, Canada, Russia and the northern United States where icing conditions are common during the winter months. Almost 30 AW189s are today in service in demanding operational conditions in Europe, USA, Middle East and South East Asia.

The FIPS system is now available as an option on the AW189 and follows certification of the Limited Ice Protection System (LIPS) in September 2015. LIPS permits flight within a known and defined envelope of icing conditions provided that the capability to descend into a known band of positive temperature is available throughout the intended route.

Leonardo-Finmeccanica says the AW189 meets the very latest international regulatory safety requirements (EASA / FAA Part 29, JAR OPS 3 / EU-OPS) and is fully compliant with the latest requirements of the oil and gas producers’ helicopter operations guidelines.

The AW189 is unique in having a 50 minute ‘run-dry’ capable main gear box, exceeding current certification standards and offering unmatched safety and reliability for long range offshore operations.

(Source: Leonardo-Finmeccanica news release. Image from file)

FMI: www.leonardocompany.com

Advertisement

More News

ANN's Daily Aero-Term (11.28.25): Unmanned Aircraft System (UAS)

Unmanned Aircraft System (UAS) An unmanned aircraft and its associated elements related to safe operations, which may include control stations (ground, ship, or air based), control>[...]

ANN's Daily Aero-Linx (11.28.25)

Aero Linx: Cactus Fly-In The Classic Airplane Association of Arizona, Inc. (CAAA) was incorporated in Arizona as a not for profit corporation on January 10, 2014. The CAAA roster i>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

Airborne 11.26.25: Bonanza-Baron Fini, Archer v LA NIMBYs, Gogo Loses$$$

Also: Bell 505 on SAF, NYPA Gets Flak For BizAv 'Abuse', FAA Venezuela Caution, Horizon Update Textron Aviation has confirmed it will be ending production of the Beechcraft Bonanza>[...]

Airborne-NextGen 11.25.25: EHang Manned Flt, Army UAVs, Starship V3 Booster Boom

Also: FedEx SAF, Archer Midnight Powertrain Tech, Rocket Lab Record, Perseverance Rover Find EHang has logged a major milestone in the development of its pilotless air taxi, loggin>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC