Lockheed Martin Trims Back Shuttle External Tank Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sat, Aug 02, 2008

Lockheed Martin Trims Back Shuttle External Tank Program

Job Cuts Begin In Fall, Will Continue Through September 2010

The first major round of layoffs tied to the September 2010 retirement of the space shuttle fleet was announced Friday. Lockheed Martin informed its Michoud Operations workforce employee reductions would begin in the fall of 2008 and continue through September 2010 as a result of the build-out of external tanks to support the planned fly-out of the Space Shuttle program.

Reductions will impact operations in Huntsville, AL, the Kennedy Space Center, FL, and New Orleans, LA where the External Tank is designed and assembled at the NASA Michoud Assembly Facility. Lockheed Martin currently employs 2,445 at the three sites.

Workforce reductions are necessary as various production activities near completion on the 154-foot long, 28-foot in diameter non-reusable external tanks. All tanks necessary to support the remaining 10 planned Space Shuttle missions currently are in production, with two scheduled for delivery to NASA by the end of 2008.

Since program inception in 1973, Lockheed Martin has delivered 124 external tanks to NASA.

The exact timing and numbers of the reductions through 2010 will be determined by production schedules and Lockheed Martin efforts to secure other work opportunities for affected employees. Lockheed says retraining and outplacement services will be available for individuals impacted by the reductions.

FMI: www.lockheedmartin.com, www.nasa.gov

Advertisement

More News

NTSB Final Report: Cozy Cub

Witness Reported The Airplane Was Flying Low And Was In A Left Bank When It Struck The Power Line Analysis: The pilot was on final approach to land when the airplane collided with >[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Seated On The Edge Of Forever -- A PPC's Bird's Eye View

From 2012 (YouTube Edition): A Segment Of The Sport Aviation World That Truly Lives "Low And Slow" Pity the life of ANN's Chief videographer, Nathan Cremisino... shoot the most exc>[...]

ANN's Daily Aero-Linx (04.29.25)

Aero Linx: International Business Aviation Council (IBAC) IBAC promotes the growth of business aviation, benefiting all sectors of its industry and in all regions of the world. As >[...]

ANN's Daily Aero-Term (04.29.25): Execute Missed Approach

Execute Missed Approach Instructions issued to a pilot making an instrument approach which means continue inbound to the missed approach point and execute the missed approach proce>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC