Shuttle Preps On Schedule For Tuesday Rollout | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sun, Oct 11, 2009

Shuttle Preps On Schedule For Tuesday Rollout

Targeted Launch Date Is November 12

Technicians are completing the careful and complex connecting tasks to complete the stacking of space shuttle Atlantis before next week's rollout to Launch Pad 39A. The work includes attaching the umbilicals from the mobile launcher platform to the aft section of Atlantis. The umbilicals have many system connections to the shuttle, and also pipe liquid oxygen and liquid hydrogen through the shuttle into the external fuel tank before launch. The connections pull away from the shuttle at liftoff.

After the work is completed, an interface test will be conducted throughout the weekend to make sure the connections between the shuttle, external tank and two solid rocket boosters are set properly. Rollout for the STS-129 mission remains scheduled for 0001 EDT on Tuesday.

The astronauts of STS-129 are completing two days of equipment reviews related to the items they will use during their mission to the International Space Station.

On the International Space Station, NASA astronaut Nicole Stott is expected to make the first official run on the COLBERT treadmill, the exercise device named for Comedy Central comedian Stephen Colbert.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC