Sun, Nov 01, 2015
Utilizes Multi-Sensor See-Through Imaging System To Present Hi-Res images
Sierra Nevada Corporation (SNC) has been awarded a task order for the next phase of development for its Degraded Visual Environment Pilotage System (DVEPS). The indefinite-delivery/indefinite-quantity (IDIQ) contract with the United States Special Operations Command Technology Applications Contracting Office was initially awarded in 2013 to increase the safety of military aircrews worldwide.

SNC’s DVE Pilotage System will allow pilots to safely operate in degraded visual environments such as brownout, smoke, sand, snow, rain and fog conditions through the use of a multi-sensor, see-through imaging system that provides real-time, high-resolution fused imagery of the terrain and obstacles. This multi-aircraft, game-changing technology will increase aircrew situational awareness of obstacles throughout all phases of flight including people, power lines, ditches, mountains, rocks and other obstacles, reducing loss of life and equipment.
SNC was competitively selected for the third phase task order following a successful airborne test of its DVEPS program at the Yuma Proving Grounds in Arizona in June 2015. This airborne test demonstrated SNC’s ability to fuse multi-sensor data into real-time, high-fidelity imagery during operations in DVE conditions. The final contract phase includes Integrated System Development/Demonstration, Low-Rate Production and Qualification testing. The effort will begin in fiscal year 2016 with Developmental Flight Testing, leading to a Milestone C decision followed by Low-Rate Initial Production to support Qualification and Operational Testing.
“It is a great honor to have been selected for the third phase of this important life-saving and mission enabling program that will provide agile, flexible and economical technology to our country’s military.” said Greg Cox, corporate vice president for SNC’s Communication, Navigation and Surveillance/Air Traffic Management business area “DVEPS combines unmatched performance in a reduced Size, Weight and Power (SWaP) envelope, creating a superior system that was unavailable at the start of the program. We look forward to finalizing this phase of the contract, leading to a Full-Rate Production decision in fiscal year 2017/2018.”
More News
Sikorsky UH-60 Black Hawk Helicopter Collided With An Unregistered DJI Mavic 3T Unmanned Aerial Vehicle On July 7, 2025, about 1557 central daylight time, an unregistered Sikorsky >[...]
“After considering the measures taken, minimum liquidity covenants in the Company's current debt obligations and cash flows to maintain current operational obligations requir>[...]
Ground Clutter A pattern produced on the radar scope by ground returns which may degrade other radar returns in the affected area. The effect of ground clutter is minimized by the >[...]
Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]
Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]