EASA Completes Its Boeing 737 MAX Test Flights | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sat, Sep 12, 2020

EASA Completes Its Boeing 737 MAX Test Flights

It's Been A LONG Road Back To Redemption For The Boeing 737 MAX

It's been a LONG road back to redemption for the Boeing 737 MAX as, first, US test pilots and engineers, followed by their Canadian counterparts examined the updated hardware and software for the airplane in anticipation of a return to commercial flight sometime (reportedly) before the end of the year.

Now,. It's EASA's turn -- The European Union Aviation Safety Agency has now completed its test flights of the Boeing 737 MAX. These took place in Vancouver, Canada due to COVID-19 travel restrictions.

As the next step in its evaluation of the aircraft for return to service, EASA is now analyzing the data and other information gathered during the flights in preparation for the Joint Operations Evaluation Board (JOEB). The JOEB is scheduled to start next week in London, Gatwick in the United Kingdom.

EASA has been working steadily, in close cooperation with the FAA and Boeing, to return the Boeing 737 MAX aircraft to service as soon as possible, but only once they are convinced it is safe.

In the meantime, Boeing is said to be frantically preparing to get a huge number of idled airplanes back to flight status and to conduct the necessary pilot and operator training to insure knowledge of current operational procedures and allow a return to currency. It's going to be a mad dash once the FAA and other regulatory agencies sign off on getting the MAX back to work. More info to come...

FMI: www.easa.europa.eu/, www.boeing.com

 


Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC