AD: Pilatus Aircraft Ltd. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Thu, Apr 04, 2019

AD: Pilatus Aircraft Ltd. Airplanes

AD NUMBER: 2019-05-15

PRODUCT: Certain Pilatus Aircraft Ltd. Model PC-7 airplanes.

ACTION: Final rule; request for comments.

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) issued by the aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as chafed and burned wires located under panel F5.

DATES: This AD is effective April 23, 2019. Comments must be received by May 20, 2019.

COST: The FAA estimates that this AD will affect 18 products of U.S. registry. Operators may incur the following costs in order to comply with this AD:

The average labor rate is $85 per workhour. Based on these figures, the FAA estimates the cost of the inspection and reporting requirement in this AD to be $304.50 per product.

  • The labor and parts costs for the follow-on actions as necessary:
  • Repairing chafed wires and installing a protective sleeve would take about 1.5 work-hours for a cost of $127.50 per product.
  • Replacing burnt or bare wires would take about 4 work-hours and require parts costing approximately $2,000 for a cost of $2,340.
  • Adjusting metal clips would take about .5 work-hour for a cost of $42.50.

The FAA has no way of determining the number of products that may need these actions.

FMI: AD

Advertisement

More News

Airborne 07.21.25: Nighthawk!, Hartzell Expands, Deltahawk 350HP!

Also: New Lakeland Fly-in!, Gleim's DPE, MOSAIC! Nearly three-quarters of a century in the making, EAA is excited about the future… especially with the potential of a MOSAIC>[...]

ANN's Daily Aero-Term (07.27.25): Estimated (EST)

Estimated (EST) -When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the >[...]

ANN's Daily Aero-Linx (07.27.25)

Aero Linx: Regional Airline Association (RAA) Regional airlines provide critical links connecting communities throughout North America to the national and international air transpo>[...]

NTSB Final Report: Luce Buttercup

The Airplane Broke Up In Flight And Descended To The Ground. The Debris Path Extended For About 1,435 Ft. Analysis: The pilot, who was the owner and builder of the experimental, am>[...]

Classic Aero-TV: 'That's All Brother'-Restoring a True Piece of Military History

From 2015 (YouTube version): History Comes Alive Thanks to A Magnificent CAF Effort The story of the Douglas C-47 named, “That’s all Brother,” is fascinating from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC