IBM Commemorates NASA's 50th Anniversary Of First U.S. Manned Space Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneNextGen-
10.21.25

Airborne-Unlimited-10.22.25

Airborne-FltTraining-10.23.25

AirborneUnlimited-10.17.25

Sun, May 08, 2011

IBM Commemorates NASA's 50th Anniversary Of First U.S. Manned Space Flight

Early IBM Analytics Technology Provided Mission Critical Data In Real-Time

As NASA celebrated the 50th anniversary of the first U.S. manned spaceflight at an event at the Kennedy Space Center on Thursday, IBM commemorated its team of mathematicians and technologists who supported the Project Mercury missions in the 1960s.

"Alan Shepard was the bravest of the brave and his flight ushered in America's space age," said Professor Arthur Cohen, the mathematician who led IBM's team that supported Project Mercury. "The IBM team had the honor of applying computing power and mathematics to support Project Mercury to provide real-time data to NASA Mission Control. We experienced an unforgettable sense of excitement when Alan Shepard safely accomplished his mission. I will forever remember May 5, 1961 and the incredible team of NASA and IBM men and women I had the opportunity to work with."

While people around the world were on the edge of their seats on May 5, 1961, the IBM team was counting on the technology they had developed to track the spacecraft and provide real-time information to Mission Control. IBM worked to address the unique data processing challenges presented by the real-time information requirements of NASA's Mercury mission.

The team developed a "real-time channel" called the IBM 7281, which could receive up to 1,000 bits of data per second -- a breakthrough innovation at the time. They also developed advanced programs and mathematics to analyze incoming data and provide "mission critical" information to NASA flight controllers throughout the space flight for evaluation and necessary action. Their work represented the early days of real-time and predictive analytics, which today is a major growth initiative for IBM. Even then, as it is today, IBM was in the business of making sense of data.

To provide real-time information to Mission Control, the IBM team installed and maintained three large-scale computers which funneled all flight information: two 7090 transistorized computers located at Goddard Space Flight Center in Greenbelt, Maryland and a 709 computer in Bermuda. The two IBM 7090 computers determined powered flight trajectory parameters and the present position of the spacecraft. They predicted future spacecraft position and transmitted continuous data for display at Mission Control throughout the flight. The IBM 709 computer calculated normal orbital flight information in addition to its most important function -- determining trajectory dynamics during the critical launch and early orbit phase. The 709 computer analyzed data from local radar and telemetry sources in real-time.

IBM's work on Project Mercury helped lay the foundation for the company's work on NASA's Gemini and Apollo space missions and how businesses and governments exploit data today -- from air traffic control systems to online travel reservations.

FMI: www.ibm.com

Advertisement

More News

Affordable Flying Expo Announces Industry MOSAIC Town Hall

Scheduled for Friday, November 7th at 1800ET, The MOSAIC Town Hall, Webcast At www.airborne-live.net One of the more intriguing features of the 2025 Affordable Flying Expo, schedul>[...]

Classic Aero-TV: Composite-FX Sets Elevates the Personal Helicopter Market

From 2023 (YouTube Edition): The Mosquito Evolves Formerly known as Mosquito, Trenton, Florida-based Composite FX is a designer and manufacturer of personal kit and factory-finishe>[...]

Aero-News: Quote of the Day (10.25.25)

“The Board is pleased to name Lisa as our next CEO after conducting a comprehensive succession planning process and believes this transition will ensure continued success for>[...]

ANN's Daily Aero-Term (10.25.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

NTSB Final Report: Gallow Daniel A Kitfox Classic IV

The Airplane Stalled Above The Runway Threshold, The Nose Dropped, The Nose Wheel Impacted The Runway, And The Airplane Flipped Over Analysis: The pilot reported that during the fi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC