Boeing Fuel Tank Issues Affect KC-46 Delivery Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Mar 11, 2023

Boeing Fuel Tank Issues Affect KC-46 Delivery Schedule

Affected Fuel Tanks Could Require Downtime for 12+ Aircraft

Boeing’s KC-46 program will likely experience more delays, just like the 767 series aircraft currently awaiting fuel tank parts.

Reportedly, a quality issue surrounding a delivery of center fuel tanks made by subcontractor Triumph Group’s aerospace structures arm. The tanks, as delivered to Boeing, were incorrectly cleaned before painting, leaving their paint application somewhat inadequate. Boeing acknowledged the existence of a ‘quality issue’ without directly affirming the Triumph issue, admitting that some 767F and KC-46 aircraft had to be worked on before delivery.

The process, if it is indeed the center fuel tank as rumored, would entail stripping and repainting the inside of affected fuel tanks, with estimates running around a dozen affected aircraft sitting in Boeing inventory. The issue may reach back further, too, with some aircraft possibly affected as far back as 2021. Triumph sold its aero structures arm to Daher Aerospace last year.

Reports cite the increasing frequency of delivery issues at Boeing, including issues with software, parts, and fabrication ahead of delivery. A data error surrounding the forward pressure bulkhead of the 787 Dreamliner has stalled deliveries of the type for a time, another rumor pointing to similar delays for 37 MAX aircraft that could stretch as long as a year, thanks to issues with the Option selection Software used for pre-delivery configuration. Boeing contends that the reports are incorrect, with the company line saying the issue was little more than a documentation change, not a software problem.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC