FAA Proposes AD For Robinson Emergency Floats | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.14.25

Airborne-NextGen-07.15.25

AirborneUnlimited-07.16.25

Airborne-FlightTraining-07.17.25

AirborneUnlimited-07.11.25

Thu, Oct 18, 2012

FAA Proposes AD For Robinson Emergency Floats

Would Require Replacement Of Inflation Valve Assembly

The FAA has published an NPRM in the Federal Register proposing an AD for Robinson Helicopter Company (Robinson) Model R44 and R44 II helicopters equipped with emergency floats, which would require replacing the inflation valve assembly. The proposed AD is prompted by failure of the emergency floats to deploy during a factory test because a needle was binding within the inflation valve assembly. The proposed actions are intended prevent the failure of the floats to inflate during an emergency landing.

The FAA is proposing this AD after an evaluation of all known relevant information and determined that an unsafe condition exists and is likely to exist or develop on other products of these same type designs. That review included Robinson R44 Service Bulletin SB-80, dated September 7, 2011 (SB), which describes procedures for upgrading certain valve assemblies within the next 250 flight hours or by June 30, 2012, whichever occurs first. The SB reports that during a factory test of pop-out emergency floats the floats failed to inflate because of a stuck cylinder valve.

The FAA estimate that this proposed AD would affect 165 helicopters of U.S. Registry and that the labor cost would average $85 per work-hour. Based on these assumptions, we estimate that replacing the inflation valve assembly would take 2.5 work-hours for a 5 labor cost of about $213. Parts would cost $850 to $955 for a total cost per helicopter of $1,063 to $1,168.

The comment period on the proposed AD is now open. The FAA says the most helpful comments reference a specific portion of the proposal, explain the reason for any recommended change, and include supporting data. To ensure the docket does not contain duplicate comments, commenters should send only one copy of written comments, or if comments are filed electronically, commenters should submit only one time. Comments must be received by December 17, 2012.

FMI: NPRM 

Advertisement

More News

ANN's Daily Aero-Term (07.15.25): Charted Visual Flight Procedure Approach

Charted Visual Flight Procedure Approach An approach conducted while operating on an instrument flight rules (IFR) flight plan which authorizes the pilot of an aircraft to proceed >[...]

Aero-News: Quote of the Day (07.15.25)

“When l became the Secretary of Defense, I committed to rebuild our military to match threats to capabilities. Drones are the biggest battlefield innovation in a generation, >[...]

ANN's Daily Aero-Linx (07.15.25)

Aero Linx: Stearman Restorers Association Welcome to the Stearman Restorers Association. The Stearman Restorers Association is an independent “Not for Profit” 501C-3 Co>[...]

NTSB Final Report: Kjelsrud Gary Kitfox

Airplane Exhibited A Partial Loss Of Engine Power When It Was About Halfway Down The Runway Analysis: The pilot of the experimental amateur-built airplane was departing from his pr>[...]

NTSB Prelim: Cessna A150L

The Flight Path Was Consistent With Low-Altitude Maneuvering On June 18, 2025, about 0922 mountain standard time, a Cessna A150L airplane, N6436F, was substantially damaged when it>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC