Mitsubishi Regional Jet Starts Full-Scale Tests toward First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Jan 15, 2015

Mitsubishi Regional Jet Starts Full-Scale Tests toward First Flight

Initial Engine Run Performed On First Flight Test Aircraft

Mitsubishi Aircraft Corporation started full-scale testing of the Mitsubishi Regional Jet (MRJ) toward its first flight scheduled in the second quarter this year.

Mitsubishi Aircraft performed the first engine run for the starboard side engine of MRJ’s first flight test aircraft at the apron of the Nagoya Airport (Nishikasugai-gun, Aichi Prefecture) on January 13th, 2015. The first engine run verified the total operations of the aircraft’s various systems including hydraulic, fuel, air conditioning, electric systems and power system such as engines.

The company also performed the wing up-bending test on the static strength test aircraft at the strength test station adjacent to Komaki South Plant of MHI's Nagoya Aerospace Systems Works (Nishikasugai-gun, Aichi Prefecture) on December 25th, 2014. The static strength test is one of the airframe tests to inspect that the aircraft meets safety standards in strength. During the testing, the maximum load that the aircraft is expected to experience while flying was applied to the wing of the static strength test aircraft, which was calculated from simulation of all flight conditions. The wing up-bending test produced anticipated results.
 
Mitsubishi Aircraft remains firmly committed to the success of the first flight with an on-track progress of the upcoming tests, such as functional tests and engineering tests.

(Image provided by Mistubishi Heavy Industries)

FMI: www.mrj-japan.com

 


Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC