Luxury Hangars Going Up At Southern California Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, Jun 07, 2012

Luxury Hangars Going Up At Southern California Airport

32 Units Planned At Cochran Regional Airport

San Diego developer Karl Higgins is betting $10 million on well-heeled aviators' interest in a luxury hangar for their aircraft. Higgins is planning 32 hangars to be built at Jacqueline Cochran Regional Airport in Thermal, CA. The project is scheduled to begin by the end of the year, and will be accomplished in phases over the next three years on a 4.5 acre site. The first units will be available mid-2013 and pricing begins at $400,000 and goes up to $1 million depending on amenities and size.

Mydesert.com reports that Higgins, executive vice president of Montecito Aviation Group says “I think we've turned the corner on the recession, and the timing is right for this project in the desert at this airport. I think our price range is in the sweet spot for the clientele that use the airport.”

Unlike any typical hangar, artist's renderings show two-story buildings with 2nd floor glass walls. Among the other amenities offered: observation decks, crew quarters, ready rooms, kitchens and offices. Outside the hangar, a communal area with fountains and a gas-fired barbecue pit with shaded patio are optional.

Higgins is targeting actors, athletes and business tycoons that already use the airport. He says the area is ideal due to its proximity to mountains, golfing and beaches. He adds “When you're flying point to point in your own aircraft, it's just a few minutes to hit San Diego and enjoy the beach.”

The new hangars at KTRM will join the existing 125 that are already in place.

FMI: www.rivcoeda.org

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

NTSB Final Report: Capella Aircraft Corp FW1C50

Pilot Reported That He Was Unfamiliar With The Single Seat Amateur-Built Airplane And His Intent Was To Perform High-Speed Taxi Testing Analysis: The pilot reported that he was unf>[...]

Classic Aero-TV: Timber Tiger Touts Curtiss Jenny Replicas

From 2023 (YouTube Edition): First Kits to Ship October 2023 Having formerly resurrected the storied shape of the Ryan ST—in effigy, anyway—Montrose, Colorado-based Tim>[...]

ANN's Daily Aero-Term (07.04.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC