F/A-22 Approved For Full-Rate Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, Apr 22, 2005

F/A-22 Approved For Full-Rate Production

Green Light Means More Raptors, More Jobs

The Lockheed Martin F/A-22 Raptor fighter aircraft has been given the green light by Department of Defense acquisition officials to enter into full-rate production.

An acquisition decision information paper released by the Department of Defense on April 18 states "The Under Secretary of Defense (Acquisition, Technology, and Logistics) [Michael W. Wynne] approved the full rate production capability of the F/A-22." This decision officially transitions the Air Force's premier fighter program to a new level of confidence and maturity.

"This is great news for warfighters whether they are soldiers on the ground or airmen guarding the skies," said Larry Lawson, Lockheed Martin Aeronautics Company executive vice president and general manager of the F/A-22 program.

"This decision reflects confidence in the performance of the aircraft demonstrated during an exhaustive Independent Operational Test & Evaluation program as well as the team's proven ability to produce the aircraft," Lawson added. "This is the culmination of a tremendous effort put forward by many in the Air Force as well as industry. The Raptor team understands the overwhelming capability the F/A-22 provides is vital today and must also be relevant for three to four decades to come."

This F/A-22 program milestone follows initial operational test findings in February and March by both the Air Force and the Department of Defense, which judged the aircraft to be "overwhelming effective" in its performance. Air Force pilots will be able to dominate any engagement with the Raptor. The F/A-22 will provide protection for troops no matter where they are, to an extent never before possible.

The F/A-22 Raptor, the world's most advanced fighter, is built by Lockheed Martin in partnership with Boeing and Pratt & Whitney. Parts and subsystems are provided by approximately 1,000 suppliers in 42 states. F/A-22 production takes place at Lockheed Martin Aeronautics facilities in Palmdale, CA; Meridian, MS; Marietta, GA; and Fort Worth, TX, as well as at Boeing's plant in Seattle, WA. Final assembly and initial flight testing of the Raptor occurs at the Marietta plant facilities.

The Raptor is slated to reach initial operational capability in December 2005 at Langley Air Force Base, Va. The F/A-22's balanced design of stealth, supercruise speed, supportability and super-agility, along with its advanced integrated avionics, will enable combat commanders to change the way future wars are fought.

FMI: www.f-22raptor.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC