AeroSports Update: MVP Aero To Build A Prototype In Maine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Thu, Jan 28, 2016

AeroSports Update: MVP Aero To Build A Prototype In Maine

The Minnesota Based Company Will Build The Prototype Of Its Multi-Capable Light Sport Aircraft At Brunswick Landing

When the MVP Aero multipurpose light sport airplane was introduced in its mockup stage at EAA AirVenture 2014, it was a showstopper. Designed for operation on land, water, and snow, it can also be used as a fishing boat or be converted into a camping tent.

The project has been underway for a while and has now developed to the point where MVP Aero has selected a location to build its first prototype, according to an article in the Bangor Daily News. According to the report, the prototype will be constructed at the former Navy Airbase at Brunswick Landing, Maine.

It’s reported that the Midcoast Regional Redevelopment Authority said that MVP Aero made the announcement of their decision to locate at Brunswick Landing at the U.S. Sport Aviation Expo in Sebring, Florida last week.

The article credits Paul Richards, MVP’s Director of Business Development, as saying the company picked the former Navy base because of its advanced airport facilities near the Androscoggin River and Casco Bay for testing the flying boat; local expertise both in composites and boatbuilding; and the ability to build the full prototype in the TechPlace building.

Apparently, this location has been decided on as the building location for the prototype but no firm decision has yet been made as to the location of the actual production facility.

The article cites Richards as saying the company estimates that will take about 18 months to two years to develop the prototype. The aircraft that has been seen at EAA AirVenture in 2014 and 2015 is not a prototype, it is an engineering mockup.

(Image from file)

FMI: Original source   www.mvp.aero

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC