Webb Telescope Reaches Another Milestone Towards 2018 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Jan 29, 2017

Webb Telescope Reaches Another Milestone Towards 2018 Launch

Raytheon Completes Factory Acceptance Testing Of Flight Operations System For NASA's James Webb Space Telescope

Factory acceptance testing of the flight operations system for the James Webb Space Telescope has been completed by Raytheon. With seven times the light-collecting power of its predecessor, the Hubble Space Telescope, this next-generation telescope will gather data and images of dust clouds, stars and galaxies deeper into space. 

Over 800 requirements were successfully verified on the JWST ground control system during the testing conducted at Raytheon's Aurora, Colorado, facility, bringing NASA's next space observatory one step closer to the scheduled 2018 launch.

"The JWST flight operations system is our latest generation of mission management and command and control capabilities for satellite operations," said Matt Gilligan, vice president of Raytheon Navigation and Environmental Solutions.  "Our ground control system will download data from space and fly the telescope as it penetrates through cosmic dust to unlock the universe's secrets like never before."

JWST takes observations in the infrared spectrum to penetrate cosmic dust to reveal the universe's first galaxies, while observing newly forming planetary systems. JWST is expected to make observations for five years, will carry enough fuel for 10 years, and is designed to withstand impacts of space debris as it orbits far beyond the Earth's Moon.  

Raytheon installed the ground control system for JWST on the campus of the Johns Hopkins University in Baltimore, Maryland, under contract to the Space Telescope Science Institute.

(Source: Raytheon news release. Image from file)

FMI: www.raytheon.com

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC