Webb Telescope Reaches Another Milestone Towards 2018 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.08.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Sun, Jan 29, 2017

Webb Telescope Reaches Another Milestone Towards 2018 Launch

Raytheon Completes Factory Acceptance Testing Of Flight Operations System For NASA's James Webb Space Telescope

Factory acceptance testing of the flight operations system for the James Webb Space Telescope has been completed by Raytheon. With seven times the light-collecting power of its predecessor, the Hubble Space Telescope, this next-generation telescope will gather data and images of dust clouds, stars and galaxies deeper into space. 

Over 800 requirements were successfully verified on the JWST ground control system during the testing conducted at Raytheon's Aurora, Colorado, facility, bringing NASA's next space observatory one step closer to the scheduled 2018 launch.

"The JWST flight operations system is our latest generation of mission management and command and control capabilities for satellite operations," said Matt Gilligan, vice president of Raytheon Navigation and Environmental Solutions.  "Our ground control system will download data from space and fly the telescope as it penetrates through cosmic dust to unlock the universe's secrets like never before."

JWST takes observations in the infrared spectrum to penetrate cosmic dust to reveal the universe's first galaxies, while observing newly forming planetary systems. JWST is expected to make observations for five years, will carry enough fuel for 10 years, and is designed to withstand impacts of space debris as it orbits far beyond the Earth's Moon.  

Raytheon installed the ground control system for JWST on the campus of the Johns Hopkins University in Baltimore, Maryland, under contract to the Space Telescope Science Institute.

(Source: Raytheon news release. Image from file)

FMI: www.raytheon.com

Advertisement

More News

ANN's Daily Aero-Term (09.10.25): Runway Entrance Lights (REL)

Runway Entrance Lights (REL) An array of red lights which include the first light at the hold line followed by a series of evenly spaced lights to the runway edge aligned with the >[...]

Airborne 09.04.25: Textron Nixes EPlane, Space Command!, CO MidAir

Also: Daher Climate Policy, Boeing Reveal, Another Laser Whacko, Spirit Proceeds Textron eAviation is putting the development of its Nexus eVTOL aircraft on hold, meaning its first>[...]

Airborne Affordable Flyers 09.11.25: MWAE25, Tests-Flt Design F2, Vashon Ranger

Also: SUN ‘n FUN’s EarlyBird, Rotax Advanced Start, Girls in Aviation Day, Lockwood RV-916! The recently concluded Midwest Aviation Expo, hosted by the Mt. Vernon Outla>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

Airborne 09.08.25: Swift Fuel Approval, ‘Diamond Lil’ Roars, SnF26 Tkts On Sale!

Also: Carrier Landings Not Required, UAL To Tel Aviv, ATC in College, EMAS Systems Stop 2 Swift Fuels 100R unleaded fuel has earned ASTM production specification approval. This 100>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC