Webb Telescope Reaches Another Milestone Towards 2018 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sun, Jan 29, 2017

Webb Telescope Reaches Another Milestone Towards 2018 Launch

Raytheon Completes Factory Acceptance Testing Of Flight Operations System For NASA's James Webb Space Telescope

Factory acceptance testing of the flight operations system for the James Webb Space Telescope has been completed by Raytheon. With seven times the light-collecting power of its predecessor, the Hubble Space Telescope, this next-generation telescope will gather data and images of dust clouds, stars and galaxies deeper into space. 

Over 800 requirements were successfully verified on the JWST ground control system during the testing conducted at Raytheon's Aurora, Colorado, facility, bringing NASA's next space observatory one step closer to the scheduled 2018 launch.

"The JWST flight operations system is our latest generation of mission management and command and control capabilities for satellite operations," said Matt Gilligan, vice president of Raytheon Navigation and Environmental Solutions.  "Our ground control system will download data from space and fly the telescope as it penetrates through cosmic dust to unlock the universe's secrets like never before."

JWST takes observations in the infrared spectrum to penetrate cosmic dust to reveal the universe's first galaxies, while observing newly forming planetary systems. JWST is expected to make observations for five years, will carry enough fuel for 10 years, and is designed to withstand impacts of space debris as it orbits far beyond the Earth's Moon.  

Raytheon installed the ground control system for JWST on the campus of the Johns Hopkins University in Baltimore, Maryland, under contract to the Space Telescope Science Institute.

(Source: Raytheon news release. Image from file)

FMI: www.raytheon.com

Advertisement

More News

KidVenture Educational Activities Lineup At EAA AirVenture 2025

Youth Explore With Hands-On Builds, RC Airplanes, Flight Sims, Much More KidVenture is located just north of the EAA Aviation Museum, at Pioneer Airport, and has arranged a myriad >[...]

Aero-News: Quote of the Day (07.07.25)

“About nine decades ago, Amelia Earhart was recruited to Purdue, and the university president later worked with her to prepare an aircraft for her historic flight around the >[...]

Airborne 07.07.25: Sully v Bedford, RAF Vandalism, Discovery Moving?

Also: New Amelia Search, B737 Flap Falls Off, SUN ‘n FUN Unveiling, F-16 Record Captain Sully Sullenberger, the pilot who saved 155 people by safely landing an A320 in the Hu>[...]

Aero-News: Quote of the Day (07.08.25)

"It is critically important for North American flight safety that Temporary Flight Restriction (TFR) violations are avoided. All pilots must familiarize themselves with updates to >[...]

Airborne-NextGen 07.08.25: Joby in Dubai, Army Electra, Archer iin Abu Dhabi

Also: Hackers v Aviation, Discovery Moving?, Gogo Galileo HDX, EVE to Costa Rica Joby Aviation announced its electric air taxi successfully completed a series of VTOL wingborne tri>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC