Vote On Appropriations Bill, With Or Without VH-71, Likely To Be Delayed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Nov 13, 2009

Vote On Appropriations Bill, With Or Without VH-71, Likely To Be Delayed

One Congressman Says Vote May Not Come Until December

A New York Congressman says the vote on the Appropriations Conference Bill could be delayed into December, in part over funding for the VH-71 Presidential Helicopter.

Rep. Maurice Hinchey

Congressman Maurice Hinchey (D-NY) says the House version of the Defense Appropriations Bill contains $485.2 million to make the first five VH-71's operational, but the Senate version does not. Congressman John Murtha (D-PA) said earlier this month that he would not push for inclusion of the funds in the conference report in a effort to not "embarrass the President" who is opposed to the funding. Murtha chairs the House Appropriations Defense Subcommittee.

Hinchey, who represents the district that is home to the Lockheed Martin facility in Owego, where the VH-71 would be assembled, said Murtha may have been misquoted in the Capital newspaper "The Hill."  He told the Binghamton Press Connects that Murtha is "under pressure from a variety of places that are opposed to continuing the VH-71."

Rep. John Murtha

Hinchey believes that if the program was funded, it could mean 600 jobs would return to Owego which were cut when it looked like the VH-71 was dead. Murtha spokesman Matthew Mazonkey did not comment on the article in "The Hill," saying "The House position on the presidential helicopter program is clear. We believe that it is in the best interest of taxpayers to make operational the five aircraft that have already been built."

FMI: http://appropriations.house.gov/Subcommittees/sub_def.shtml

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

NTSB Final Report: Capella Aircraft Corp FW1C50

Pilot Reported That He Was Unfamiliar With The Single Seat Amateur-Built Airplane And His Intent Was To Perform High-Speed Taxi Testing Analysis: The pilot reported that he was unf>[...]

Classic Aero-TV: Timber Tiger Touts Curtiss Jenny Replicas

From 2023 (YouTube Edition): First Kits to Ship October 2023 Having formerly resurrected the storied shape of the Ryan ST—in effigy, anyway—Montrose, Colorado-based Tim>[...]

ANN's Daily Aero-Term (07.04.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC