Boeing Plants To Face Scheduled FAA Audit | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Feb 03, 2014

Boeing Plants To Face Scheduled FAA Audit

Both Washington State And South Carolina Locations Will Be Examined

The FAA is getting set to perform scheduled audits at Boeing facilities in Washington State and North Carolina. The facilities are audited every two years to assure compliance with Boeing's production certificate.

The North Charleston, SC facility was not included in the most recent audit, which was conducted in 2012, according to a report from the Herald of Everett, WA. The east-coast plant was added to the company's production certificate, PC700, after the audit was completed.

Boeing has hired contractors in South Carolina in an effort to meet increased production goals for the Dreamliner. While the east coast facility still lags behind the Puget Sound factories in airplane production, many analysts say it is only a matter of time before there is parity between the two locations. Candy Eslinger, a Boeing spokeswoman in South Carolina, said there have been some challenges, but she fully expects the North Charleston plant to meet its production goal of 10 planes per month.

There have been 115 Dreamliners delivered to 16 customers so far, and Boeing has orders for a total of 1,030 of the airplanes.

(Dreamliner image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC