NATA Seeks Extension On Hazmat Training NPRM | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Jun 30, 2003

NATA Seeks Extension On Hazmat Training NPRM

NATA has formally requested a 60-day extension in the comment period for a Notice of Proposed Rulemaking (NPRM) on changes to Hazardous Material (HAZMAT) regulations. The comment period closes on July 7, 2003.

The NPRM proposes to "add requirements for repair stations that would allow the FAA to increase its oversight of the training they are required to conduct under the DOT's HAZMAT training requirements in 49 CFR Part 172." It also imposes requirements on "will-not" carry operators that are only slightly less burdensome than those who make a living as "will-carry" operators.

"Although the NPRM appears straightforward and relatively uncomplicated, a closer look reveals a significant expansion to the existing regulatory requirements," said NATA vice president Joseph E. (Jeb) Burnside. "The proposed rule estimates over $100 million in costs for our members--most of which are small businesses--over a 10-year period. We believe this figure has been grossly underestimated, especially for small businesses that elect not to carry hazardous materials."

Additionally, the proposed regulations fail to accurately envision the operating environment of Part 135 on-demand air charter operators. The regulations fail to provide for the flexibility that is instrumental to the continued operation of the industry.

"The scope of this NPRM demands that more time be provided to analyze its full impact on the industry and the businesses that NATA represents," added Burnside. "We believe that a moderate extension to the comment period will allow development of alternative regulations that will offer an equivalent level of safety while addressing the more burdensome aspects of the current proposal."

FMI: www.nata-online.org

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC