AD: GE Honda Aero Engines Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Aug 13, 2019

AD: GE Honda Aero Engines Turbofan Engines

AD NUMBER: 2019-16-02

PRODUCT: All GE Honda Aero Engines (GHAE) HF120 model turbofan engines with a certain fuel pump metering unit (FPMU) assembly.

ACTION: Final Rule.

SUMMARY: This AD was prompted by damage found on the permanent magnetic alternator (PMA) drive gear within the FPMU assembly.

This AD requires removal of a certain FPMU assembly and its replacement with a part eligible for installation.

DATES: This AD is effective September 13, 2019.

COST: The FAA estimates hat this AD affects 161 engines installed on airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Replace the FPMU

  • Labor: 6.5 work-hours × $85 per hour = $552.50 per engine.
  • Parts: $50,000.
  • Cost per engine: $50,552.50.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC