Navy Announces Successful Test Of Electromagnetic Catapult On CVN 78 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneUnlimited-
10.14.25

Airborne-Unlimited-10.15.25

Airborne-NextGen-10.16.25

AirborneUnlimited-10.17.25

Sat, May 23, 2015

Navy Announces Successful Test Of Electromagnetic Catapult On CVN 78

EMALS Testing To Continue This Summer

The Navy conducted the first-ever, shipboard, full-speed catapult shots using the Electromagnetic Aircraft Launch System (EMALS) aboard the aircraft carrier Pre-Commissioning Unit (PCU) Gerald R. Ford (CVN 78), Naval Sea Systems Command announced May 15.

EMALS is a carrier-based launch system designed to expand the operational capability of the Navy's future carriers to include all current and future planned carrier aircraft. The recent test shots, known as "no-loads" because no aircraft or other loads were attached to the launching shuttle, successfully demonstrated the integrated catapult system. Using electromagnetic technology, the system delivers substantial improvements in system maintenance, increased reliability and efficiency, higher-launch energy capacity, and more accurate end-speed control, with a smooth acceleration at both high and low speeds. By allowing linear acceleration over time, electromagnetic catapults also place less stress on the aircraft.

"This is a very exciting time for the Navy," said Program Executive Officer for Aircraft Carriers Rear Adm. Tom Moore. "For the first time in over 60 years, we've just conducted 22 no load test shots using electricity instead of steam technology."

During the tests, generators within the ship produced an electric pulse, which was passed through power conditioning electronics to linear motors just below the flight deck surface. This energy allowed for the linear motors to propel the launching shuttle down the catapult track in excess of 180 knots before bringing the shuttle to a stop at the end of the track.

The next phase of EMALS testing, scheduled for this summer, will involve launching "dead-loads" off of the bow of CVN 78 into the James River. "Dead-loads" are large, wheeled, steel vessels weighing up to 80,000 pounds to simulate the weight of actual aircraft. The dead-loads will be launched from each catapult using a specific test sequence to verify that the catapult and its components are operating satisfactorily.

To date PCU Gerald R. Ford is 90 percent complete and 1550 Sailors have reported for introduction and training. CVN 78 will be commissioned in March 2016.

(U.S. Navy image)

FMI: www.navy.mil

Advertisement

More News

Aero-News: Quote of the Day (10.23.25)

“Sport Pilot 2.0 gives more people than ever the opening to pursue their dreams of putting themselves in the pilot seat and enjoying the unique perspectives of flight. This v>[...]

United Airliner Likely Hit Weather Balloon, Not Space Object

WindBorne’s CEO Cooperating In Investigation Of Mysterious Incident After a mysterious collision with what was thought to be either an asteroid or space debris, it’s lo>[...]

Atlanta Cops Block Attempted Shooting at Hartsfield-Jackson

Man Arrested After Attempting to Bring an Assault Rifle Into the World’s Busiest Airport A 49-year-old man was arrested by Atlanta police officers for allegedly planning a ma>[...]

Aviation Tracking Technology Bill Flies Through the Senate

Senate Commerce Committee Passes Cruz’s ROTOR Act The Rotorcraft Operations Transparency and Oversight Reform (ROTOR) Act, introduced by Chairman Ted Cruz and Ranking Member >[...]

ALPA Praises Bipartisan Bill To Mitigate Helicopter Risks

ROTOR Act Closes Loopholes And Mandate Safety Technology The Air Line Pilots Association, Int’l, issued a statement lauding a bipartisan bill introduced by Senators Ted Cruz >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC