Another Delay? Dreamliner Delivery May Push To 2011 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jul 17, 2010

Another Delay? Dreamliner Delivery May Push To 2011

Boeing Says IF It Happens, It Would Only Be "A Few Weeks" Into The New Year

The head of Boeing's 787 program said in a Friday conference call with reporters that, while the company still plans to get the Dreamliner to their launch customer late in 2010, the delivery could slip "a few weeks" into 2011.

Scott Fancher said ANA, which is scheduled to get the first of the new airliners, is being kept in the loop on the delivery schedule. The Chicago Tribune reports that Fancher said the potential delay is due in part to inspections and fixes necessary to address several production issues in planes that have already been built. Fancher did say that the most recent problem, which was discovered in the horizontal stabilizer, has been resolved, and all five Dreamliners in the test program are again flying.

Fancher said the flight test program was going somewhat slower than anticipated because each airplane has to be fitted with new test instruments as the program proceeds, which is taking longer than planned. But he said the design of the Dreamliner is not among the issues that could delay the delivery.

FMI: www.boeing.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC