Navy Aviation Training Pipeline Full To Overflowing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, May 26, 2010

Navy Aviation Training Pipeline Full To Overflowing

There Are Currently More Student Pilots Pre-Loaded Than Slots Available

In an effort to reduce and stabilize the current wait time for training, the Navy is seeking to decrease the number of officers in the Aviation Preflight Indoctrination (API) student pilot pre-load. Reductions to aviation fleet requirements and recent material challenges with training aircraft have caused the student pilot population to exceed the optimal preload by approximately 200 personnel.

"Typically, time from commissioning to API start should be three months. The current delays have increased this time to six months," said Capt. Mike White, director, Aviation Officer Distribution.

To assist in reducing the number of students in the pipeline, Navy officials have planned to offer redesignation to qualified volunteers. "Qualified volunteers from the existing API pool will be solicited through June," White said. "Community managers and detailers will be available to answer questions and make assessments of volunteers' qualifications and affinities toward alternative paths. Following an administrative review board, those selected will be removed from training status and administratively redesignated. If an individual is not accepted, for whatever reason, they will continue aviation training."

Navy officials are also planning to offer delays or deferments via internships, graduate education, and other temporary additional duty options, prior to moving to Pensacola, FL. "We have been pursuing internship opportunities through various agencies in the Washington, D.C. area for our U.S. Naval Academy graduates," White said. "In addition, several newly commissioned officers will go directly to Naval Postgraduate School to pursue a graduate degree while graduates from Reserve Officer Training Corps (ROTC) units around the country will have the opportunity to work locally with their unit or perhaps in recruiting."

Beginning in December, some Navy ROTC graduates may be assigned to the Individual Ready Reserve (IRR) until their API start date. "The length of time spent in the IRR will be dependent on their API class start date," White said. "Nominally, this period will be about three to six months."

FMI: www.npc.navy.mil/Officer/Aviation

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC