Diamond Rolls Out D-Jet S/N002 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Jul 20, 2007

Diamond Rolls Out D-Jet S/N002

First Flight Expected In August

On Friday, July 20, 2007 Diamond Aircraft celebrated the roll out of its second single-engine D-Jet, S/N002.  S/N002 is the first D-Jet intended to conform to the expected production configuration in its structural layout, and aerodynamic design.

From the photos, the most obvious differences between the two aircraft are the lack of winglets on S/N002, as well as deicing surfaces on the leading edges of the wing, and horizontal and vertical stabilizers. The production-spec aircraft also incorporates a pair of small stablizers on the underside of the empennage, added to the prototype during flight testing, as well as what appears to be an aluminum-framed forward windscreen.

The D-Jet team is now preparing S/N002 for first flight next month, while simultaneously building the next three certification test planes on the same production-spec tooling used for S/N002.

The most obvious differences between the two aircraft are the lack of winglets on S/N002, as well as a larger windshield on the production-spec aircraft.

Diamond expects to certify the D-Jet by in mid-2008, with deliveries starting immediately thereafter.

The London, Ontario planemaker reports demand for the D-Jet has been very strong, with over 300 orders taken world-wide. The North American retail delivery schedule is completely sold out for the first year and a half of production, with only a very limited number of Premium deposit slots available for late 2009 delivery from select Diamond Distributors.

FMI: www.diamondair.com

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC