C-17 Aircrew Drops 77,000 Pounds From FL250 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Apr 27, 2010

C-17 Aircrew Drops 77,000 Pounds From FL250

Breaks Aircraft Record For Heaviest Airdrop In Test For NASA

Members of the 418th Flight Test Squadron here set a record for the heaviest single payload ever extracted out of a C-17A T-1 during flight April 14 over Yuma Proving Ground, AZ.

A 77,000 pound jumbo drop test vehicle was extracted out of a C-17 at 25,000 feet. The JDTV is used to test the parachutes for NASA's Ares I launch vehicle's solid rocket booster.

NASA, in conjunction with Alliant Techsystems and the United Space Alliance, is providing a decelerator recovery system for the new five-motor segment solid rocket booster. This recoverable SRB is used in support of the Ares I space launch vehicle and is heavier than the current recoverable space shuttle SRB. The increase in weight requires a larger set of parachutes for deceleration and recovery. Testing must be accomplished in order to validate the design of a new drogue and new main parachutes for the Ares I launch vehicle.

"The test is designed to collect data and to see how the parachutes react to different weights," said Ellis Hines, the 418th FLTS C-17 Ares project manager. "Once testing is completed, eventually these parachutes will be attached to the Ares I boosters."

Prior to this record 77,000-pound drop the 418th FLTS staff had successfully completed 42,000, 60,000 and 70,000 pound JDTV Ares I airdrops.


File Photo

The next airdrop is an 85,000 pound drop scheduled for 2011. The test program will culminate with a 90,000 pound airdrop scheduled for fall 2011.

"We have to do this incrementally to see how the parachutes hold up," Mr. Hines said. "The ultimate goal is 90,000 pounds."

418th FLTS engineers have partnered with Boeing to analyze the effects of these heavyweight drops on aircraft ramp structural members and collect data in real time during the drops. Additionally, mission systems engineers have worked hand-in-hand with Yuma Proving Ground officials and NASA officials to develop rigging procedures for the airdrop platform and test vehicle.

FMI: www.nasa.gov

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

NTSB Final Report: Capella Aircraft Corp FW1C50

Pilot Reported That He Was Unfamiliar With The Single Seat Amateur-Built Airplane And His Intent Was To Perform High-Speed Taxi Testing Analysis: The pilot reported that he was unf>[...]

Classic Aero-TV: Timber Tiger Touts Curtiss Jenny Replicas

From 2023 (YouTube Edition): First Kits to Ship October 2023 Having formerly resurrected the storied shape of the Ryan ST—in effigy, anyway—Montrose, Colorado-based Tim>[...]

ANN's Daily Aero-Term (07.04.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC