TRU Simulation + Training Qualifies Second Boeing 737 MAX FFS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Thu, May 04, 2017

TRU Simulation + Training Qualifies Second Boeing 737 MAX FFS

Receives Type VII Qualification From CAAS

TRU Simulation + Training has completed ICAO 9625 Edition 4 Interim Type VII qualification of the Boeing 737 MAX Full Flight Simulator (FFS) by the Civil Aviation Authority of Singapore (CAAS) at the Boeing Training Campus in Singapore. The device received qualification on March 30, 2017.

The successful qualification marks the second of four 737 MAX Full Flight Simulators that TRU will deliver to Boeing’s worldwide network of training campuses this year. The first system is currently operational at Boeing’s campus in Miami, FL and is part of 10-year training agreement under which TRU will deliver multiple 737 MAX FFS suites to Boeing’s global network of training campuses.

“TRU is committed to the timely and efficient delivery and qualification of these truly world-class, state-of-the-art 737 MAX FFS suites to Boeing Training Campuses,” said George Karam, Vice President and General Manager of TRU’s Air Transport Simulation Division. “Our agreement with Boeing further enhances TRU’s position and reputation as a leading training systems supplier to global aircraft manufacturers and their airline customers.”

The 737 MAX FFS incorporates the TRU Horizon distributed I/O system that converts complex electronic signals into a single universally-used output that allows the integration of real aircraft panels without requiring modification. This innovative approach yields other advantages, including: reduced overall weight to optimize motion capabilities; requires 80 percent less wiring than traditional simulation devices; reduced simulator downtime; reduced spare parts requirements; provides a turnkey solution that is less expensive and easier to maintain.

(Source: Textron news release. Image from file)

FMI: www.textron.com

Advertisement

More News

NTSB Prelim: Piper PA-23

Pilot Also Reported That Due To A Fuel Leak, The Auxiliary Fuel Tanks Were Not Used On June 4, 2025, at 13:41 eastern daylight time, a Piper PA-23, N2109P, was substantially damage>[...]

Classic Aero-TV: One Man’s Vietnam

From 2023 (YouTube Edition): Reflections on War’s Collective Lessons and Cyclical Nature The exigencies of war ought be colorblind. Inane social-constructs the likes of racis>[...]

NTSB Final Report: Capella Aircraft Corp FW1C50

Pilot Reported That He Was Unfamiliar With The Single Seat Amateur-Built Airplane And His Intent Was To Perform High-Speed Taxi Testing Analysis: The pilot reported that he was unf>[...]

Classic Aero-TV: Timber Tiger Touts Curtiss Jenny Replicas

From 2023 (YouTube Edition): First Kits to Ship October 2023 Having formerly resurrected the storied shape of the Ryan ST—in effigy, anyway—Montrose, Colorado-based Tim>[...]

ANN's Daily Aero-Term (07.04.25): Performance-Based Navigation (PBN) [ICAO]

Performance-Based Navigation (PBN) [ICAO] Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a d>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC