GE Aviation Freezes Design Of Passport Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.02.25

Airborne-NextGen-06.03.25

AirborneUnlimited-06.04.25

Airborne-AffordableFlyers-06.05.25

AirborneUnlimited-06.06.25

Tue, May 15, 2012

GE Aviation Freezes Design Of Passport Engine

First Engine Set To Test Next Year

The architectural design of GE's Passport engine for the Bombardier Global 7000 and Global 8000 aircraft has been finalized. The "Tollgate 6" review, part of GE's New Product Introduction process, was held on April 27. With the design frozen, GE now begins the detailed design phase. Component fabrication will begin soon, leading to the start of assembly of the first full engine by year end. The first engine is scheduled to begin testing in 2013.

"With the engine architecture in place, the team is now focused on moving the Passport engine from CAD drawings to development assembly," said Brad Mottier, vice president and general manager of GE Aviation's Business and General Aviation organization. "The Passport engine will incorporate advanced technologies and materials to provide 8% lower specific fuel consumption than engines in its class, margin to emissions and noise regulations and world-class reliability and support."
 
The Passport engine for the Global 7000 and Global 8000 business jets will produce 16,500 pounds of thrust and incorporate a composite fan case that will reduce weight, a unique 52" front fan blisk for lower cabin noise and vibration and technologies from GE's eCore suite that reduce emissions and improve fuel efficiency. The Passport's integrated propulsion system from Nexcelle, a joint venture between GE and Safran, will provide aerodynamic advantages and feature outward opening clamshell upper and lower cowl doors for easy maintenance access and high dispatch availability.
 
Since launching the engine in 2010, GE has conducted validation tests on the fan blisk design and other components with positive results. Testing was completed on two eCore demonstrators, which accumulated 150 hours. Another eCore demonstrator is scheduled to run next year.

FMI: www.geaviation.com

Advertisement

More News

ANN's Daily Aero-Term (06.02.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

ANN's Daily Aero-Linx (06.02.25)

Aero Linx: Airpower Museum The APM owns 30 acres on Antique Airfield, including the south half of the N-S runway. It consists of three hangars, an annex, and a library. The museum >[...]

NTSB Prelim: Champion 7ECA

Patient Told The First Responders That The “Man Who Was In The Plane Was Flying At The Time Of The Accident And Had Overshot The Runway They Were Attempting To Land On.&rdquo>[...]

Classic Klyde Morris (From 06.10.22)

Klyde Just Can't Believe This Has Gotten To This Point... FMI: www.klydemorris.com>[...]

Airborne 05.30.25: Anti-Helicopter Bill, PW Strike Done, All-Electric Bristell

Also: Duffy Wants $$$, KS Airports, Morningside U’s Aviation School, New Airstrip In ID After 6 were killed in a helicopter crash over the Hudson River, several US Representa>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC