Discovery External Tank Repairs Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.27.25

AirborneNextGen-
10.28.25

Airborne-Unlimited-10.29.25

Airborne-Unlimited-10.30.25

AirborneUnlimited-10.17.25

Tue, Jan 04, 2011

Discovery External Tank Repairs Underway

Engineers Analyze Data On All 108 Stringers

Technicians working on space shuttle Discovery's external fuel tank in the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida began repairs Monday on three support beams, called stringers, that recently were detected to have small cracks on their tops.

Engineers at various NASA centers continue to analyze data from testing and X-ray type image scans collected during the past week of all 108 stringers on the outside of the external tank's intertank section. The image scans showed four small cracks on three stringers on the opposite side of the tank from Discovery. Managers decided Thursday to have those cracks repaired in a similar fashion to repairs made on cracks on two stringers found after Discovery's Nov. 5 launch attempt.

The repair work is estimated to take 2-3 days. Any further work will be evaluated thoroughly during the week after additional data and analysis are reviewed.

Technicians at NASA's Kennedy Space Center in Florida will also begin modifications to 34 additional stringers on space shuttle Discovery's external fuel tank on Tuesday. Crews will fit pieces of metal, called radius blocks, over the tops of the stringers located at the external tank's thrust panel area to increase the structural support of the stringers. The thrust panel areas are located at the attachment points between the tank and the solid rocket boosters, which see the most stress during the flight into orbit.

The work is expected to take approximately one week. Teams currently are performing scans on all of the tank's stringers using a backscatter device, which bounces radiation off the tank allowing engineers to see below the foam insulation. Engineers at various NASA centers continue to analyze testing and imaging data. Managers will meet again Thursday to determine whether radius block modifications are needed on the remaining stringers.


Discovery Tank Repairs

The next available launch date for Discovery's STS-133 mission to the International Space Station remains Feb. 3 at the opening of a window that extends through Feb. 10.

FMI: www.nasa.gov

Advertisement

More News

A ‘Crazy’ Tesla Flying Car is Coming

Musk Claims the Tech Could Be Unveiled Within a Couple of Months Elon Musk is once again promising the impossible…this time, in the form of a Tesla that flies. Speaking on T>[...]

ANN's Daily Aero-Term (11.xx.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.01.25)

"It was pretty dang cool to be in a tube-and-fabric bush plane that high, and it was surreal hearing airline pilots over ATC wondering what a Cub was doing up there. The UL is trul>[...]

ANN's Daily Aero-Linx (11.01.25)

Aero Linx: Lake Amphibian Club Over the years the cost of a new Skimmer or Lake went from about $16,000 to over $500,000 for many reasons. Sales of Renegades have been very sparse >[...]

Classic Aero-TV: EAA Introduces Angle of Attack Training

From 2024 (YouTube Edition): Clinic Aimed to Promote Safe Aircraft Control The EAA Pilot Proficiency Center hosted an angle of attack (AOA) training clinic during the 2024 Oshkosh >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC